UK EPR fees 2027 to 2028: year 3 is locked to a 1.6 red factor on 2026 data, while the base fee is still open

PackUK has not published UK EPR fees for 2027 to 2028 (year 3); what is fixed is that red-rated household packaging will pay 1.6 times the amber fee, charged on packaging supplied in calendar 2026 and rated under RAM version 1.1, while the amber base fee and the green discount will only be known when PackUK publishes illustrative and then confirmed fees.

By the SPI teamPublished Updated 20 min readFigures as of 6 Nov 2026

Year 3 in three numbers: a fixed red factor, a red plastic rate that follows the base fee, and 55 days of rated supply left

1.6

Red factor for 2027 to 2028

times the amber fee, up from 1.2 in 2026 to 2027

PackUK modulation statement

£728

Red plastic per tonne if amber stayed at £455

SPI calculation, not a PackUK fee

SPI calculation

55

Days of 2026 supply left to rate

2026 supply sets the year 3 bill, on SPI's reading of regulation 60

SPI calculation

Source: GOV.UK (PackUK), modulation statement and Year 2 illustrative fees; SPI calculation (SPI summary), checked 13 Oct 2026.

The £728 figure is an SPI calculation: the year 2 illustrative amber plastic fee of £455 times 1.6. It is not a PackUK fee; the year 3 amber fee has not been published. The 55 days run from 6 November to 31 December 2026.

As of 6 November 2026, GOV.UK’s EPR for packaging collection page, last updated on 29 October 2026, lists neither confirmed year 2 fees nor any year 3 figures. This SPI Ledger piece sets out what is already decided for year 3, prices the open variables in GBP with clearly labelled SPI scenarios, and shows which of five levers moves a producer’s bill most.

Exhibit 1For SPI's cereal brand, a missing assessment on its board moves the year 3 bill more than the red factor, the base fee and the market combined Unit: £ per year, size of each change, GBP
Exhibit 1. For SPI's cereal brand, a missing assessment on its board moves the year 3 bill more than the red factor, the base fee and the market combined6 bars. Largest: Board unassessed, so it defaults to red (adds), 73,080.Board unassessed, so it defaults tored (adds)Board unassessed, so it defaults to red (adds): 73,080 £ per year, size of each change, GBP73,080Film rated amber instead of red(saves)Film rated amber instead of red (saves): 16,380 £ per year, size of each change, GBP16,380Green discount rises from 9% to 27%(saves)Green discount rises from 9% to 27% (saves): 14,680 £ per year, size of each change, GBP14,680Red factor rises from 1.2 to 1.6(adds)Red factor rises from 1.2 to 1.6 (adds): 10,980 £ per year, size of each change, GBP10,980Base fees rise 7.6% (adds)Base fees rise 7.6% (adds): 7,980 £ per year, size of each change, GBP7,980Market cleaner, discount 18% not 27%(adds)Market cleaner, discount 18% not 27% (adds): 7,560 £ per year, size of each change, GBP7,560Exhibit 1. For SPI's cereal brand, a missing assessment on its board moves the year 3 bill more than the red factor, the base fee and the market combined6 bars. Largest: Board unassessed, so it defaults to red (adds), 73,080.Board unassessed, so it defaults to red (adds)Board unassessed, so it defaults to red (adds): 73,080 £ per year, size of each change, GBP73,080Film rated amber instead of red (saves)Film rated amber instead of red (saves): 16,380 £ per year, size of each change, GBP16,380Green discount rises from 9% to 27% (saves)Green discount rises from 9% to 27% (saves): 14,680 £ per year, size of each change, GBP14,680Red factor rises from 1.2 to 1.6 (adds)Red factor rises from 1.2 to 1.6 (adds): 10,980 £ per year, size of each change, GBP10,980Base fees rise 7.6% (adds)Base fees rise 7.6% (adds): 7,980 £ per year, size of each change, GBP7,980Market cleaner, discount 18% not 27% (adds)Market cleaner, discount 18% not 27% (adds): 7,560 £ per year, size of each change, GBP7,560

Source: SPI calculation from PackUK Year 2 illustrative fees and the PackUK modulation statement; brand from the SPI fee-market note for the United Kingdom (SPI summary), checked 13 Oct 2026.

GBP only. The brand supplies 400 t of paperboard rated green and 60 t of film rated red (an SPI assumption). The red factor and green discount bars are measured from its year 2 illustrative bill of £108,700; the other four from SPI's year 3 base bill of £105,000, which holds year 2 amber fees and uses a 27% green discount. Each bar moves one lever only. Direction is in the label. Not a forecast or a liability.

Show the data
Exhibit 1. For SPI's cereal brand, a missing assessment on its board moves the year 3 bill more than the red factor, the base fee and the market combined (£ per year, size of each change, GBP)
Lever£ change (£ per year, size of each change, GBP)
Board unassessed, so it defaults to red (adds)73,080
Film rated amber instead of red (saves)16,380
Green discount rises from 9% to 27% (saves)14,680
Red factor rises from 1.2 to 1.6 (adds)10,980
Base fees rise 7.6% (adds)7,980
Market cleaner, discount 18% not 27% (adds)7,560

Executive summary

UK packaging extended producer responsibility (pEPR) charges large producers a disposal fee for each tonne of household packaging they supply. The third assessment year runs from 1 April 2027 to 31 March 2028. On 6 November 2026 PackUK, the scheme administrator, had published no fee for it: not an illustrative fee, not a base fee and not a green discount. Its year 2 fees were still illustrative too, with the year 2 notice of liability planned by the end of November 2026, according to the operational plan updated on 10 August 2026.

Year 3 is still more settled than the gap in published numbers suggests. PackUK’s modulation statement, dated 28 June 2025, fixes the red factor for 2027 to 2028 at 1.6 times the amber fee. Regulation 60 of SI 2024/1332 ties each assessment year to supply in the calendar year before it, so year 3 is charged on 2026 supply. PackUK told producers on 1 July 2026 that RAM 2027 does not affect reporting for 2025 or 2026, which on SPI’s reading means 2026 supply is rated under RAM version 1.1. The ratings that set year 3 are therefore being earned now, and 2026 supply ends in 55 days.

Two numbers stay open: the amber base fee, which follows council costs and reported tonnage, and the green discount, which follows how much red the whole market reports. SPI ran both through one producer from its own UK fee-market data, a cereal brand with 400 tonnes of green paperboard and 60 tonnes of red film. On SPI’s base case its year 3 disposal bill is £105,000, 3.4% below its year 2 illustrative bill, because the deeper green discount on its board outweighs the higher red fee on its film. Across SPI’s scenarios the same packaging costs £92,568 to £121,114.56 (Exhibit 9).

The lesson for budgets is about evidence more than design. In Exhibit 1, the single largest lever is not the red factor, which is known, but the board line falling to red for lack of an assessment record, which would add £73,080 at SPI’s base case. Leaders should close assessment gaps on 2026 supply before the second-half return is due on 1 April 2027, budget year 3 as a range, and wait for PackUK’s illustrative fees before treating any year 3 rate as a fee.

Key findings

  1. PackUK had published no year 3 (2027 to 2028) fees by 6 November 2026; GOV.UK’s fee guidance, updated on 28 October 2026, says illustrative fees are published before each assessment year starts, and confirmed fees are calculated during it.
  2. The red factor for year 3 is fixed at 1.6 times the amber fee, against 1.2 in year 2 and 2.0 in year 4, under PackUK’s modulation statement dated 28 June 2025.
  3. SPI calculation: if year 3 amber fees stayed at year 2 illustrative levels, red plastic would cost £728 a tonne and red paper and board £336, and the red premium over amber would rise from £90 to £273 a tonne for plastic.
  4. SPI calculation: at the 1.6 factor, a scheme-wide fee-weighted red-to-green ratio of 0.30 to 0.60 gives a green discount of 18% to 36%, so green plastic would sit between £291.20 and £373.10 a tonne at year 2 amber levels (Exhibit 6).
  5. Base fees moved by minus 13.1% to plus 60.7% between year 1 and year 2 on SPI’s arithmetic on rounded figures, and PackUK attributes most of the rise to lower reported tonnage plus 1.9% council cost inflation.
  6. SPI calculation: SPI’s cereal brand pays £105,000 in year 3 on the base case, down from £108,700, while its film rises from 30.1% to 41.6% of the disposal bill; an unassessed board line would add £73,080.
  7. SI 2025/1369, in force from 1 January 2026, lets PackUK weigh whether packaging uses no more material than reasonably necessary when it modulates, and allows closed loop packaging waste to be offset in disposal fee calculations; SPI has not seen PackUK apply either to year 3.

Where UK EPR fees 2027 stand on 6 November 2026

The search for UK EPR fees 2027 meets a plain answer: there is no published year 3 fee table. GOV.UK’s collection page for extended producer responsibility for packaging, last updated on 29 October 2026, lists two fee documents only, the 2025 base fees for year 1 and the guidance on waste disposal fees for large producers. The year 2 illustrative fees of December 2025 remain the latest PackUK fee table, and its operational plan says confirmed year 2 fees cannot be calculated until all data is in and regulators have checked it.

GOV.UK’s fee guidance, rewritten on 28 October 2026 under the new title “Waste disposal fees for large producers under EPR for packaging”, explains the sequence. Illustrative fees come before the assessment year, to give an early indication; during the year PackUK checks them against producer data and regulator compliance information and calculates confirmed fees. For year 2 the illustrative table came in December 2025, three and a half months before the year began. SPI has not yet confirmed when PackUK will publish year 3 illustrative fees; the guidance commits only to before 1 April 2027.

Exhibit 2For year 3, the red factor, the data year and the rulebook are set; the base fee, the green discount and the notice date are not
ItemStatus on 6 Nov 2026Where it comes from
Red factor for 2027 to 2028Set at 1.6 times amberPackUK modulation statement
Packaging the year 3 fee is charged onSupply in calendar 2026, on SPI's readingSI 2024/1332, regulation 60
Recyclability rules for that supplyRAM version 1.1, on SPI's readingPackUK RAM 2027 notice, 1 Jul 2026
Year 3 amber base feesNot publishedGOV.UK collection page
Year 3 green discountNot published; depends on full 2026 ratingsPackUK modulation statement
Year 3 illustrative fee tableNot published; due before 1 Apr 2027GOV.UK fee guidance, 28 Oct 2026
Confirmed year 2 feesNot published; notice planned by end Nov 2026PackUK operational plan
Year 3 notice of liability dateNot announcedNo source yet

Source: GOV.UK (PackUK) modulation statement; Year 2 illustrative fees; RAM 2027 notice, 1 Jul 2026; operational plan, updated 10 Aug 2026; collection page, updated 29 Oct 2026; legislation.gov.uk, SI 2024/1332 (SPI summary), checked 13 Oct 2026.

Status as read by SPI on 6 November 2026. The data year and RAM version rows are SPI's reading of regulation 60 and PackUK's 1 July 2026 notice, not a PackUK statement about year 3.

For context on scale, the operational plan forecasts year 2 fee recovery of about £1.558 billion, of which £1.47 billion is council disposal cost, £28 million administration and £60 million impairment. There is no year 3 forecast yet; the plan says local authority data arriving after 1 May 2026 will feature in the 2027 to 2028 assessment year under a separate operational plan. The year 2 bill and its November notice are covered in SPI’s year 2 RAM ratings analysis, which this piece does not repeat.

Why 2026 supply sets the year 3 bill

Regulation 60(1) of SI 2024/1332, as substituted by SI 2025/1369 from 1 January 2026, makes a person a liable producer for an assessment year if it is a producer in all or part of that year and if, in the calendar year ending on 31 December before the year starts, it acted in a listed producer role, was a large producer and supplied household packaging. PackUK’s modulation statement applied the same logic to the first modulated year: 2026 to 2027 fees use 2025 packaging data.

Run forward, that gives a clean cycle. Year 2 is priced on 2025 supply, year 3 on 2026 supply and year 4, the first at the 2.0 factor, on 2027 supply. Large producers report each half year: January to June 2026 data was due on 1 October 2026, and July to December 2026 data is due on 1 April 2027, according to GOV.UK’s reporting deadlines page updated on 19 August 2026. Small producers report the whole of 2026 by 1 April 2027 but pay no disposal fee.

Exhibit 3Each fee year prices the previous year's supply, so year 3 at 1.6 rests on 2026 packaging rated under RAM 1.1
Fee yearSupply pricedRAM versionRed factorIllustrative feesNotice of liability
Year 2, 2026 to 202720251.11.2December 2025Planned by end November 2026
Year 3, 2027 to 202820261.11.6Not yet publishedNot yet announced
Year 4, 2028 to 20292027RAM 20272.0Not yet publishedNot yet announced

Source: SI 2024/1332, regulation 60; PackUK modulation statement; PackUK RAM 2027 notice, 1 Jul 2026; GOV.UK reporting deadlines, updated 19 Aug 2026; PackUK operational plan (SPI summary), checked 18 Nov 2026.

The supply year and RAM version for years 3 and 4 are SPI's reading of the cited texts. PackUK has not published year 3 or year 4 fee timetables.

The rulebook question has one wrinkle. The modulation statement says the most recent RAM version at the time each year’s invoices are generated will be used, while PackUK’s notice of 1 July 2026 says RAM 2027 applies to packaging supplied in 2027 and does not affect reporting for 2025 or 2026. SPI reads the later, more specific notice as governing 2026 data and therefore year 3. SPI has not yet confirmed how PackUK will reconcile the two texts and would raise it with PackUK or counsel.

That matters most for PFAS. Under RAM version 1.1, intentionally added PFAS makes packaging an automatic red, except where the predominant material is aluminium, steel or glass, GOV.UK’s RAM guidance (updated 4 September 2025) says. The wider concentration limits of RAM 2027 begin with 2027 supply and so, on SPI’s reading, first price year 4, as SPI’s RAM 2027 PFAS report sets out.

SPI analysis

For year 3 the design window has largely closed. A pack redesigned in December 2026 changes at most a few weeks of rated supply. What is still open is the record: whether each 2026 line has an assessment that supports its rating when the second-half return goes in on 1 April 2027.

What last year's move says about the base fee

The red factor multiplies the amber fee, so the amber fee is the first number a year 3 budget needs. PackUK sets one base fee per material from net council costs for that material, plus its share of overheads, divided by household tonnage placed on the market, the SPI fee-market note for the United Kingdom records from GOV.UK’s 2025 base fees publication. Both the numerator and the denominator move each year.

Exhibit 4Between year 1 and year 2 the amber base fee moved from minus 13.1% for other materials to plus 60.7% for wood
MaterialYear 1 base feeYear 2 amber, illustrativeChange (%)
Wood28045060.7
Fibre-based composite46152513.9
Steel25929012.0
Plastic4234557.6
Paper and board1962107.1
Glass1922056.8
Aluminium2662701.5
Other259225-13.1

Source: GOV.UK (PackUK), Year 2 illustrative waste disposal fees, Table 1, 16 Dec 2025, updated 19 Dec 2025; SPI calculation, checked 13 Oct 2026.

GBP only. Year 1 base fees are rounded to the nearest £1 and year 2 amber fees to the nearest £5, so SPI's percentages differ slightly from PackUK's, which use unrounded fees (about 1% for aluminium, 60% for wood and minus 15% for other). Year 2 figures are illustrative.

PackUK’s year 2 page explains the pattern. Council cost increases follow the Office for Budget Responsibility’s CPI inflation figure of 1.9%, several adjustments were made to the local authority cost model after year 1 feedback, and lower reported tonnage drives most of the amber increases. Wood’s 60.7% jump reflects a large drop in declared wood tonnes, partly because material was reported under other categories. Single-use PET, aluminium and steel drinks containers from 150 ml to 3 litres are already outside the tonnage, because they fall under the deposit return schemes.

In practice: PackUK, year 1.

The denominator effect has a precedent. PackUK said on 24 February 2026 that year 1 disposal fees would not change, even though producers’ resubmitted data showed lower total tonnage than first estimated; because fees divide costs by tonnage, that created a funding shortfall, which the UK government agreed to cover as a one-off. The operational plan states the general rule plainly, and it adds that PackUK reviews fees at each formal recalculation to avoid a surplus or a shortfall.

SPI analysis

For year 3 the denominator is 2026 household tonnage, which large producers finish reporting on 1 April 2027. If producers keep correcting declared tonnage downwards, as in year 1, per tonne fees rise even with flat council costs. SPI therefore treats the year 1 to year 2 range as the only published evidence for how far a base fee can move in one cycle, and uses minus 5% to plus 13.9% as its planning range. These are SPI assumptions, not forecasts.

Year 3 rates per tonne on SPI's base case

With the factor fixed and the base fee unknown, the cleanest view of year 3 holds year 2 illustrative amber fees and applies the published rules. Red is amber times 1.6. Green is amber less a common discount. For the discount, SPI uses the scheme ratio implied by PackUK’s provisional year 2 figure: a 9% discount at a 1.2 factor implies a fee-weighted red-to-green ratio of about 0.45, which at 1.6 gives 27%. The derivation is set out in SPI’s year 2 analysis; here it is applied to all eight materials.

Exhibit 5SPI calculation: at year 2 amber levels, the red premium over amber triples in year 3, to £273 a tonne for plastic and £315 for fibre-based composite
MaterialGreenAmberRed
Fibre-based composite475525630
Plastic415455545
Wood410450540
Steel260290345
Aluminium245270325
Other materials205225270
Paper and board190210250
Glass185205245

Source: SPI calculation from GOV.UK (PackUK), Year 2 illustrative waste disposal fees, updated 19 Dec 2025, and the PackUK modulation statement, checked 13 Oct 2026.

GBP only. Year 3 columns are SPI calculations, not PackUK fees: amber held at year 2 illustrative levels, red at 1.6 times amber, green at a 27% discount. Real year 3 fees will reflect new council cost and 2026 tonnage data. Do not add rows across materials.

Two readings follow. First, the red column is certain once amber is known, because the factor is fixed; only the base fee can move it. Second, the green column is uncertain twice over, because it depends on the base fee and on the market’s ratings. In Exhibit 5 the year 3 green rate is below the year 2 green rate for every material, by £35.35 to £91.75 a tonne, but that holds only if amber fees stay flat and the discount reaches 27%.

SPI calculation: the red premium over amber is 0.2 times amber in year 2 and 0.6 times amber in year 3. For plastic that is £90 rising to £273 a tonne; for paper and board, £40 rising to £126. A producer with 100 tonnes of red plastic pays £27,300 more than if those tonnes were amber at SPI’s base case, against £9,000 in year 2.

The green discount is the number no producer controls

PackUK’s annex formula makes the discount a ratio: the extra money raised from red tonnes across all eight materials, divided by the fee value of all green tonnes. It is applied as one equal percentage to every green tonne in every material. The statement says modulation will not increase the total of household disposal fees, and regulation 64(11) caps modulated fees at the year’s expected net efficient disposal costs.

The consequence is that a green tonne’s price depends on other producers’ red tonnes. PackUK’s year 2 discount of about 9% was built on ratings covering 45% of first-half 2025 tonnage, of which 71% was green, 8% amber and 21% red, and the page calls it illustrative and provisional. Year 3 will rest on 2026 ratings, which PackUK has not published in any form.

Exhibit 6SPI calculation: year 3 green plastic lands anywhere from £276.64 to £424.96 a tonne, depending on the base fee and the market's ratings Unit: £ per tonne of green plastic, GBP

LowerHigher(shade by fifths of all values in the table)

Exhibit 6. SPI calculation: year 3 green plastic lands anywhere from £276.64 to £424.96 a tonne, depending on the base fee and the market's ratings (£ per tonne of green plastic, GBP)
Base fee changeGreen at 18% discountGreen at 27% discountGreen at 36% discountRed at any discount
Minus 5.0%354.45315.54276.64691.60
No change373.10332.15291.20728.00
Plus 7.6%401.46357.39313.33783.33
Plus 13.9%424.96378.32331.68829.19

Source: SPI calculation from PackUK Year 2 illustrative amber fee for plastic (£455) and the PackUK modulation statement formula, checked 13 Oct 2026.

GBP only. Rows change the year 2 amber fee by the stated percentage (SPI assumptions drawn from the year 1 to year 2 range in Exhibit 4). Discounts of 18%, 27% and 36% correspond to scheme red-to-green ratios of 0.30, 0.45 and 0.60 at the 1.6 factor. The red column does not depend on the discount. Not PackUK fees.

Read across a row and the base fee is fixed; the spread comes from the market alone. At a flat base fee, green plastic varies by £81.90 a tonne between the 18% and 36% cases. Read down a column and the spread comes from costs and tonnage: £70.51 a tonne at the 18% discount. Both unknowns are about the same size for a green tonne, and neither is in the producer’s hands.

SPI analysis

The market variable has a direction worth noting. Producers who redesigned during 2026 reduce the scheme’s red tonnage, which shrinks the pot that funds the discount. A green producer’s year 3 rate can therefore rise because competitors improved, a feature of the design that budget owners often miss.

Five levers that move a packaging bill in GBP

SPI’s framework sorts what moves a year 3 bill into five levers, drawn from the modulation statement, SI 2024/1332 and PackUK’s reporting rules. Each lever has an owner and a date after which it can no longer move for year 3. The point is to spend effort where the producer still has control.

Exhibit 7SPI framework: of five levers on a year 3 bill, only the assessment record and the reported tonnage are still in the producer's hands
LeverWho controls itFixed for year 3 byEffect on one tonne of plasticFirst move
Red factorPackUK, by its published statementAlready set at 1.6Red premium £273 over amber, up from £90Price red lines at 1.6 now
Base feeCouncil costs and all producers' tonnageYear 3 illustrative and then confirmed feesEach 1% on amber adds £4.55 amber and £7.28 redBudget a range, not a point
Green discountThe whole market's ratingsFull 2026 ratings, after 1 Apr 202718% to 36% gives £291.20 to £373.10 greenDo not bank a discount
Own ratingsProducer, through design31 Dec 2026 supplyRed to amber saves £273; red to green saves £395.85Too late for most 2026 lines
Assessment recordProducer, through evidence1 Apr 2027 return, then resubmission cut-offsAn unassessed green tonne costs £395.85 moreClose gaps on 2026 lines now

Source: SPI analysis of the PackUK modulation statement; SI 2024/1332, regulations 60 and 64; GOV.UK reporting deadlines and RAM version 1.1 guidance, checked 18 Nov 2026.

Per tonne effects are SPI calculations for plastic at year 2 illustrative amber fees and are illustrative only. Business analysis, not legal advice.

The first three levers are external. The red factor is published. The base fee is set by PackUK’s cost model and by tonnage reported across the market. The discount is set by everyone’s ratings. A finance team can model them but not change them, and SPI’s advice is to carry them as ranges until PackUK’s year 3 illustrative table appears.

The last two levers are internal, and only one is still live. Design changes on 2026 supply are nearly spent. The assessment record is not. GOV.UK’s RAM guidance classes in-scope household packaging as automatically red where it has not been assessed or where the details needed for an assessment are missing, and regulation 64(8) tells PackUK to treat packaging without sufficient information as having the sustainability of the least sustainable packaging in its category.

SPI analysis

The resubmission window is a lever in its own right. For 2025 data PackUK set 1 September 2026 as the last resubmission that could change fees and notices, and said future cut-offs may come earlier, the SPI tracker record for PR-GB-002 notes from PackUK’s 6 July 2026 announcement. SPI has not yet confirmed the cut-off for 2026 data.

One cereal brand, three year 3 scenarios

To show the levers on a whole bill, SPI used the worked producer in its own UK fee-market note: a breakfast cereal brand above the £2 million turnover line that sells in folding paperboard cartons with a plastic film liner. The note assumes 400 tonnes of cartons rated green and 60 tonnes of liners rated red, and that the brand imports the liners itself with under 30% recycled content. The ratings are assumptions, not assessments, and the brand is illustrative, not a real company.

Exhibit 8SPI calculation: the cereal brand's disposal bill falls to £105,000 in year 3 on the base case, while its film rises from 30.1% to 41.6% of it
LineYear 1, 2025 to 2026Year 2, 2026 to 2027 illustrativeYear 3, 2027 to 2028 SPI base
Paperboard cartons, 400 t, green78,400.0076,000.0061,320.00
Film liners, 60 t, red25,380.0032,700.0043,680.00
Disposal fee total103,780.00108,700.00105,000.00
Plastic Packaging Tax on 60 t of imported linersNot computed13,729.2014,193.60

Source: SPI calculation from GOV.UK (PackUK) Year 2 illustrative fees and Table 1 year 1 base fees; PackUK modulation statement; Budget 2026 Annex A, 28 Oct 2026; brand from the SPI fee-market note for the United Kingdom (SPI summary), checked 13 Oct 2026.

GBP only. Year 1 is unmodulated. Year 2 is illustrative. Year 3 is SPI's base case: year 2 amber fees, red at 1.6, green at a 27% discount. Plastic Packaging Tax is a separate HMRC charge on 2027 to 2028 imports at £236.56 a tonne and £228.82 in 2026 to 2027; it is shown for scale only and was not computed for year 1. Not tax advice.

SPI calculation: the film is 13% of the brand’s tonnes and 30.1% of its year 2 disposal bill. In SPI’s year 3 base case it becomes 41.6%, as its rate rises from £545 to £728 a tonne while the board’s falls from £190 to £153.30. The brand’s total falls 3.4% because 87% of its tonnes are green and the deeper discount outweighs the higher red rate.

Exhibit 8 also shows why the disposal fee and the tax should be kept apart. The disposal fee for year 3 is charged on 2026 supply; the Plastic Packaging Tax for 2027 to 2028 is charged on plastic packaging manufactured in or imported into the UK from 1 April 2027, at £236.56 a tonne according to the Budget 2026 rates annex of 28 October 2026. The two charges share a twelve-month window but not a tonnage base. The tax rate and its 2027 changes are covered in SPI’s plastic packaging tax 2027 analysis.

Exhibit 9SPI calculation: the same 460 tonnes cost £92,568 to £121,114.56 in year 3, and an amber film rating cuts each case by £15,561 to £17,624.88
CaseBase fee change (%)Green discount (%)Board lineFilm line, redTotal as isChange vs year 2 (%)Total with film amber
Low bill-5.03651,072.0041,496.0092,568.00-14.8477,007.00
Base0.02761,320.0043,680.00105,000.00-3.4088,620.00
High bill7.61874,114.8846,999.68121,114.5611.42103,489.68

Source: SPI calculation from PackUK Year 2 illustrative amber fees and the PackUK modulation statement; brand from the SPI fee-market note for the United Kingdom (SPI summary), checked 13 Oct 2026.

GBP only. Scenarios are SPI assumptions. Low bill: base fees 5% below year 2 amber and a 36% discount (scheme ratio 0.60). Base: year 2 amber and 27% (ratio 0.45). High bill: base fees 7.6% above year 2 amber, plastic's year 1 to year 2 move, and 18% (ratio 0.30). Change compares the as-is total with the year 2 illustrative bill of £108,700. Not a forecast or a liability.

The range is £28,546.56 wide, about a quarter of the year 2 bill, and none of it comes from the brand’s own packaging. A cleaner market and a higher base fee together turn a 3.4% saving into an 11.4% increase. SPI analysis: a budget built on the base case alone would be right only if both external numbers land near the middle, which PackUK’s own warnings about its illustrative fees give no reason to assume.

The internal lever is visible in the last column. If the film liner could be documented as amber rather than red, the year 3 bill would fall by £16,380 at the base case. Whether a film liner can reach amber under RAM version 1.1 depends on the assessment, and SPI has not assessed it. Under RAM 2027, PackUK’s materials guidance rates flexible plastic red by default and amber only with take-back evidence, which is relevant from year 4.

The cost of a missing assessment

The largest bar in Exhibit 1 is not a design decision. If the brand’s 400 tonnes of green board had no assessment record for 2026 supply, the board would be reported as red and priced at £336 a tonne instead of £153.30, adding £73,080 at SPI’s base case. That one gap would cost more than four times the saving from rating the film amber.

Exhibit 10SPI calculation: in year 3 a tonne pushed from amber to red by a missing record costs £123 to £315, three times the year 2 penalty Unit: £ per tonne, year 3 red minus amber, GBP
Exhibit 10. SPI calculation: in year 3 a tonne pushed from amber to red by a missing record costs £123 to £315, three times the year 2 penalty8 bars. Largest: Fibre-based composite, 315.Fibre-based compositeFibre-based composite: 315.00 £ per tonne, year 3 red minus amber, GBP315.00PlasticPlastic: 273.00 £ per tonne, year 3 red minus amber, GBP273.00WoodWood: 270.00 £ per tonne, year 3 red minus amber, GBP270.00SteelSteel: 174.00 £ per tonne, year 3 red minus amber, GBP174.00AluminiumAluminium: 162.00 £ per tonne, year 3 red minus amber, GBP162.00OtherOther: 135.00 £ per tonne, year 3 red minus amber, GBP135.00Paper and boardPaper and board: 126.00 £ per tonne, year 3 red minus amber, GBP126.00GlassGlass: 123.00 £ per tonne, year 3 red minus amber, GBP123.00Exhibit 10. SPI calculation: in year 3 a tonne pushed from amber to red by a missing record costs £123 to £315, three times the year 2 penalty8 bars. Largest: Fibre-based composite, 315.Fibre-based compositeFibre-based composite: 315.00 £ per tonne, year 3 red minus amber, GBP315.00PlasticPlastic: 273.00 £ per tonne, year 3 red minus amber, GBP273.00WoodWood: 270.00 £ per tonne, year 3 red minus amber, GBP270.00SteelSteel: 174.00 £ per tonne, year 3 red minus amber, GBP174.00AluminiumAluminium: 162.00 £ per tonne, year 3 red minus amber, GBP162.00OtherOther: 135.00 £ per tonne, year 3 red minus amber, GBP135.00Paper and boardPaper and board: 126.00 £ per tonne, year 3 red minus amber, GBP126.00GlassGlass: 123.00 £ per tonne, year 3 red minus amber, GBP123.00

Source: SPI calculation from PackUK Year 2 illustrative amber fees and the PackUK modulation statement (SPI summary), checked 13 Oct 2026.

GBP only. Holds year 2 illustrative amber fees; the gap is 0.6 times amber in year 3 against 0.2 times amber in year 2 (for plastic, £273 against £90). For a tonne that would otherwise be green, add the discount: £395.85 for plastic at a 27% discount. Not PackUK fees.

Show the data
Exhibit 10. SPI calculation: in year 3 a tonne pushed from amber to red by a missing record costs £123 to £315, three times the year 2 penalty (£ per tonne, year 3 red minus amber, GBP)
MaterialYear 3 red minus amber (£ per tonne, year 3 red minus amber, GBP)
Fibre-based composite315.00
Plastic273.00
Wood270.00
Steel174.00
Aluminium162.00
Other135.00
Paper and board126.00
Glass123.00

The order in Exhibit 10 follows the amber fee, so it would hold whatever the year 3 base fees turn out to be, as long as their order does not change. The absolute stakes are the point. The cost of a missing record roughly triples from year 2 to year 3 because the red factor’s premium goes from 0.2 to 0.6 times amber, and it rises again to 1.0 times amber in year 4.

In practice: Tesco.

Tesco’s Annual Report 2026, published in May 2026, names the new EPR levy among the causes of cost inflation and records a payable for it at the year end, the SPI Packaging Buyers Database records. The same profile notes Tesco as Deputy Chair of PackUK’s Scheme Administrator Steering Group. For a retailer that accrues the levy, year 3 is the first year the accrual has to carry a 1.6 factor, an unpublished base fee and a market-driven discount at once.

In practice: Reckitt.

The Buyers Database profile for Reckitt records an average of 12% recycled content in its plastic packaging in 2024 and notes that the recyclability bands of PR-GB-003 price Finish pouches and other flexible formats separately from rigid bottles. SPI has not seen Reckitt’s RAM ratings, so no year 3 figure is stated; the case shows how one portfolio can sit on both sides of the green discount.

What the 2025 amendments add to year 3

SI 2024/1332 has been amended once in a way that touches fees. The Producer Responsibility Obligations (Packaging and Packaging Waste) (Amendment) Regulations 2025, SI 2025/1369, came into force on 1 January 2026, according to its regulation 1. Its explanatory note lists changes to how disposal and administration fees are calculated.

Three changes bear on year 3. First, the note says closed loop packaging waste may be offset against the weight of household packaging used in calculating a producer’s disposal fees, with a matching duty to keep records and report it. Second, regulation 64(7) gains a sixth factor, whether the amount of packaging material used is no more than reasonably necessary, which PackUK may take into account when modulating. Third, the note makes provision for the late assessment of a liable producer’s fees. SPI has not yet confirmed the first assessment year in which the closed loop offset applies.

SPI analysis

The new minimisation factor does not change year 3 on its own. Regulation 64(12) lets PackUK modulate only in line with its published statement, and the statement on GOV.UK, dated 28 June 2025, uses recyclability under RAM as its only factor, with a first review due no later than 2028. SPI found no revised statement on GOV.UK by 6 November 2026. A weight or volume factor would need a new statement first. How this fee sits beside the UK’s other packaging charges is set out in SPI’s UK packaging regulations guide.

In practice: UK Packaging PRO.

The producer-led organisation now gathers change requests for the RAM. PackUK said on 22 October 2026 that requests for RAM 2028 must be supported by evidence and sent to UK Packaging PRO by 31 December 2026, and that the next version will focus on a smaller number of priority areas, such as take-back schemes. That timetable shapes year 5 ratings, not year 3, but it falls in the same eight weeks as the last 2026 supply.

Industry reaction

“PackUK publishes illustrative waste disposal fees before the start of each assessment year.”

GOV.UK, EPR for packaging guidance, Waste disposal fees for large producers under EPR for packaging, updated 28 October 2026

The same page adds that confirmed fees are calculated during the assessment year, after PackUK checks the illustrative figures against producer data and regulator compliance information. For year 3, that means two moments to budget for: the illustrative table before April 2027 and the confirmed calculation within 2027 to 2028.

“PackUK intends to issue the initial notice of liability for the 2026 to 2027 assessment year by the end of November 2026.”

PackUK, UK scheme administrator, PackUK operational plan 2026 to 2027, updated 10 August 2026

The year 2 notice will be the first priced by recyclability. Its red, amber and green lines are the closest evidence producers will have of how PackUK treats their ratings before year 3 begins.

“As obligated tonnages change, per tonne fees will change slightly.”

PackUK, UK scheme administrator, PackUK operational plan 2026 to 2027, updated 10 August 2026

Year 1 showed that “slightly” can still mean a shortfall large enough for the government to cover, which is why SPI’s scenarios carry a base fee range.

“RAM 2027 applies to packaging supplied in 2027 and does not affect reporting for 2025 or 2026.”

PackUK, UK scheme administrator, PackUK publishes Recyclability Assessment Methodology (RAM) 2027, 1 July 2026

On SPI’s reading, that sentence places the whole of year 3 under RAM version 1.1, so the new PFAS limits and the take-back route for flexible plastic first affect fees in year 4.

Exhibit 11Year 3 is decided between now and April 2027: the last 2026 supply, the second-half return and the illustrative table
  • past
  • next
Exhibit 11. Year 3 is decided between now and April 2027: the last 2026 supply, the second-half return and the illustrative table9 dated items from 16 Dec 2025 to 2028.20252026202720282029Today16 Dec 2025: Year 2 illustrative red, amber and green fees published1 Jan 2026: SI 2025/1369 in force: closed loop offset and minimisation factor1 Jul 2026: RAM 2027 published for 2027 supply; RAM 1.1 stays for 20261 Oct 2026: First-half 2026 data due from large producers28 Oct 2026: GOV.UK fee guidance rewritten on illustrative and confirmed feesNov 2026: Year 2 notice of liability planned by end of month31 Dec 2026: 2026 supply ends; RAM 2028 evidence due to UK Packaging PRO1 Apr 2027: Second-half 2026 data due; year 3 starts at 1.6; tax at £236.562028: First modulation review, no later than this yearExhibit 11. Year 3 is decided between now and April 2027: the last 2026 supply, the second-half return and the illustrative table9 dated items from 16 Dec 2025 to 2028.20252026202720282029Today16 Dec 2025: Year 2 illustrative red, amber and green fees published1 Jan 2026: SI 2025/1369 in force: closed loop offset and minimisation factor1 Jul 2026: RAM 2027 published for 2027 supply; RAM 1.1 stays for 20261 Oct 2026: First-half 2026 data due from large producers28 Oct 2026: GOV.UK fee guidance rewritten on illustrative and confirmed feesNov 2026: Year 2 notice of liability planned by end of month31 Dec 2026: 2026 supply ends; RAM 2028 evidence due to UK Packaging PRO1 Apr 2027: Second-half 2026 data due; year 3 starts at 1.6; tax at £236.562028: First modulation review, no later than this year
  1. Year 2 illustrative red, amber and green fees publishedpast
  2. SI 2025/1369 in force: closed loop offset and minimisation factorpast
  3. RAM 2027 published for 2027 supply; RAM 1.1 stays for 2026past
  4. First-half 2026 data due from large producerspast
  5. GOV.UK fee guidance rewritten on illustrative and confirmed feespast
  6. Year 2 notice of liability planned by end of monthnext
  7. 2026 supply ends; RAM 2028 evidence due to UK Packaging PROnext
  8. Second-half 2026 data due; year 3 starts at 1.6; tax at £236.56next
  9. 2028First modulation review, no later than this yearnext

Source: GOV.UK (PackUK); legislation.gov.uk, SI 2024/1332 and SI 2025/1369; Budget 2026 Annex A (SPI summary), checked 18 Nov 2026.

Dates as stated in each source, read on 6 November 2026. The year 3 illustrative table is due before 1 April 2027 under GOV.UK's fee guidance; PackUK has not given a date.

Show the data
Exhibit 11. Year 3 is decided between now and April 2027: the last 2026 supply, the second-half return and the illustrative table
DateLabelCategoryLink
2025-12-16Year 2 illustrative red, amber and green fees publishedpasthttps://www.gov.uk/government/publications/illustrative-waste-disposal-fees-2026-extended-producer-responsibility-for-packaging/year-2-illustrative-waste-disposal-fees-extended-producer-responsibility-for-packaging
2026-01-01SI 2025/1369 in force: closed loop offset and minimisation factorpasthttps://www.legislation.gov.uk/uksi/2025/1369/regulation/1/made
2026-07-01RAM 2027 published for 2027 supply; RAM 1.1 stays for 2026pasthttps://www.gov.uk/government/news/packuk-publishes-recyclability-assessment-methodology-ram-2027
2026-10-01First-half 2026 data due from large producerspasthttps://www.gov.uk/guidance/packaging-data-check-reporting-periods-and-submission-deadlines
2026-10-28GOV.UK fee guidance rewritten on illustrative and confirmed feespasthttps://www.gov.uk/guidance/waste-disposal-fees-for-large-producers-under-epr-for-packaging
2026-11Year 2 notice of liability planned by end of monthnexthttps://www.gov.uk/government/publications/packuk-operational-plan/packuk-operational-plan-2026-to-2027
2026-12-312026 supply ends; RAM 2028 evidence due to UK Packaging PROnexthttps://www.gov.uk/government/news/a-new-approach-to-ram-updates
2027-04-01Second-half 2026 data due; year 3 starts at 1.6; tax at £236.56nexthttps://www.gov.uk/guidance/packaging-data-check-reporting-periods-and-submission-deadlines
2028First modulation review, no later than this yearnexthttps://www.gov.uk/government/publications/extended-producer-responsibility-for-packaging-modulated-disposal-fees/packuk-extended-producer-responsibility-epr-for-packaging-producer-disposal-fees-modulation-statement

What leaders should do now

  1. Packaging compliance leads, by 31 December 2026: list every 2026 household packaging line without a documented RAM version 1.1 assessment and close it, because an unassessed line is reported as red and, at SPI’s base case, costs £273 more per tonne of plastic than amber in year 3.
  2. Data owners, before the 1 April 2027 return: reconcile second-half 2026 tonnage and ratings to the first-half return filed by 1 October 2026, so the year 3 bill is not built on a mix of corrected and uncorrected data.
  3. Finance directors, in the 2027 to 2028 budget round: carry year 3 as a range like Exhibit 9, with at least three base fee and discount cases, and replace it with PackUK’s illustrative table when it appears.
  4. Finance directors, when the year 2 notice arrives by end November 2026: check its red, amber and green tonnes against your own 2025 submissions; the same treatment will apply to 2026 data in year 3.
  5. Commercial teams, by Q1 2027: split the EPR line in cost models by material and rating, since a 13% red share can be 41.6% of the bill, as in SPI’s cereal case.
  6. Procurement, at the next supplier review: require converters to supply the component data behind each RAM rating, so a missing document does not move a green line to red.
  7. Sustainability teams, by 31 December 2026: decide whether to submit evidence to UK Packaging PRO for RAM 2028, and separately prepare 2027 supply for RAM 2027 and the year 4 factor of 2.0.

Questions for your board

  • How much of our 2026 household packaging, by tonnes, has no documented RAM assessment today?
  • What does our year 3 bill look like at base fees 5% lower and 13.9% higher than year 2, and at green discounts of 18% and 36%?
  • What share of our EPR bill comes from red tonnes, compared with their share of our weight?
  • Are we accruing year 3 at a single rate, and who signs off the range we use instead?
  • Do our year 2 notice lines match our own 2025 data, and what would we do if they did not?
  • Which of our red lines become green or amber under RAM 2027, and which stay red into year 4?

What to watch

  • 30 Nov 2026: PackUK’s year 2 notice of liability, planned by the end of November, will show the first confirmed red, amber and green rates.
  • 31 Dec 2026: 2026 supply ends, closing the design window for year 3; RAM 2028 evidence is due to UK Packaging PRO.
  • Before 1 Apr 2027: PackUK’s year 3 illustrative fees, due before the assessment year starts under GOV.UK’s fee guidance; SPI has not yet confirmed a date.
  • 1 Apr 2027: large producers’ second-half 2026 data and small producers’ full-year 2026 data are due; year 3 begins with red at 1.6.
  • 2027 to 2028: confirmed year 3 fees are calculated during the assessment year; PackUK has not announced the notice date.
  • 2028: PackUK’s first review of modulation factors falls due no later than this year.

Methodology

  • Data used: PackUK’s year 2 illustrative fees (16 December 2025, updated 19 December 2025), which also print the year 1 base fees; the modulation statement and its annex formula (dated 28 June 2025, published 17 February 2026); GOV.UK fee guidance (updated 28 October 2026), operational plan (updated 10 August 2026), RAM 2027 notice (1 July 2026), RAM version 1.1 guidance (updated 4 September 2025) and reporting deadlines (updated 19 August 2026); SI 2024/1332 regulations 60 and 64 as amended, and SI 2025/1369; the Budget 2026 rates annex for the tax rate; SPI tracker records PR-GB-002 and PR-GB-003 and the SPI UK fee-market note (14 October 2026); SPI Buyers Database profiles for Tesco and Reckitt.
  • Year 3 calculations: amber equals year 2 illustrative amber adjusted by the stated base fee change; red equals amber times 1.6; green equals amber times one minus the discount; the discount equals 0.6 times an assumed scheme fee-weighted red-to-green ratio of 0.30, 0.45 or 0.60. The 0.45 ratio is implied by PackUK’s provisional 9% discount at 1.2. All are SPI assumptions.
  • Brand: the cereal brand is the worked example in SPI’s UK fee-market note, with assumed ratings; it is not a real company.
  • Counting rules: GBP only. Year 2 rates are PackUK’s rounded illustrative figures, so totals differ from unrounded invoice arithmetic.
  • Cut-off: 6 November 2026.
  • Limitations: no year 3 fee has been published; real fees will reflect new council costs, 2026 tonnage and ratings, and any change PackUK makes. Nothing here is a liability estimate, legal advice or tax advice; confirm obligations with PackUK, your compliance scheme or counsel.

FAQ

What are the UK EPR fees for 2027?

PackUK has not published fees for 2027 to 2028, year 3 of UK packaging EPR. What is fixed is the red factor of 1.6 times the amber fee. Base fees and the green discount are unknown. GOV.UK says illustrative fees are published before each assessment year starts, so year 3 figures are due before 1 April 2027.

When will PackUK publish year 3 illustrative fees?

GOV.UK’s fee guidance, updated on 28 October 2026, says illustrative fees come before the start of each assessment year, which for year 3 is 1 April 2027. Year 2’s table came in December 2025. PackUK has not announced a date for year 3, and its confirmed fees follow during the assessment year.

What is the red RAM factor for 2027 to 2028?

Red-rated household packaging pays 1.6 times the amber fee in 2027 to 2028, under PackUK’s modulation statement. The factor was 1.2 in 2026 to 2027 and rises to 2.0 in 2028 to 2029. It is fixed, so the red fee moves only with the amber base fee, not with how much red the market reports.

Which packaging data sets the 2027 to 2028 EPR fee?

On SPI’s reading of regulation 60 of SI 2024/1332, year 3 is charged on household packaging supplied in calendar 2026. Large producers reported January to June 2026 by 1 October 2026 and report July to December 2026 by 1 April 2027. PackUK says RAM 2027 does not affect reporting for 2026.

How much will red plastic cost per tonne in 2027 to 2028?

That depends on the unpublished year 3 amber fee. If plastic’s amber fee stayed at the year 2 illustrative £455 a tonne, red plastic would cost £728 by SPI’s calculation. If amber rose 7.6%, as it did between year 1 and year 2, red plastic would cost £783.33. Neither figure is a PackUK fee.

Does the 2027 PFAS rule affect year 3 EPR fees?

On SPI’s reading, no. RAM 2027, with its concentration limits for PFAS, applies to packaging supplied from 2027, which sets year 4 fees in 2028 to 2029. Year 3 rests on 2026 supply rated under RAM version 1.1, where intentionally added PFAS already makes most packaging an automatic red.

Sources

  1. GOV.UK, Extended producer responsibility for packaging, collection page, updated 29 October 2026, consulted 2026-11-06.
  2. GOV.UK (PackUK), Year 2 illustrative waste disposal fees: extended producer responsibility for packaging, 16 December 2025, updated 19 December 2025, consulted 2026-11-06.
  3. GOV.UK (PackUK), Producer disposal fees modulation statement, dated 28 June 2025, published 17 February 2026, consulted 2026-11-06.
  4. GOV.UK, Waste disposal fees for large producers under EPR for packaging, updated 28 October 2026, consulted 2026-11-06.
  5. GOV.UK (PackUK), PackUK operational plan: 2026 to 2027, updated 10 August 2026, consulted 2026-11-06.
  6. GOV.UK (PackUK), PackUK publishes Recyclability Assessment Methodology (RAM) 2027, 1 July 2026, consulted 2026-11-06.
  7. GOV.UK, Recyclability assessment methodology: how to assess your packaging waste, updated 4 September 2025, consulted 2026-11-06.
  8. GOV.UK, Packaging data: check reporting periods and submission deadlines, updated 19 August 2026, consulted 2026-11-06.
  9. GOV.UK (PackUK), Year 1 Extended Producer Responsibility for packaging fees update, 24 February 2026, consulted 2026-11-06.
  10. GOV.UK (PackUK), A new approach to RAM updates, 22 October 2026, consulted 2026-11-06.
  11. legislation.gov.uk, SI 2024/1332, regulation 60 (liability to pay disposal and administration fees), as amended, consulted 2026-11-06.
  12. legislation.gov.uk, SI 2024/1332, regulation 64 (modulation of household packaging waste disposal fees), as amended, consulted 2026-11-06.
  13. legislation.gov.uk, The Producer Responsibility Obligations (Packaging and Packaging Waste) (Amendment) Regulations 2025, SI 2025/1369, regulation 1, consulted 2026-11-06.
  14. legislation.gov.uk, SI 2025/1369, explanatory note, consulted 2026-11-06.
  15. HM Treasury and HMRC, Budget 2026 overview of tax legislation and rates, Annex A: rates and allowances, 28 October 2026, consulted 2026-11-06.
  16. SPI Regulation Tracker, PR-GB-003 and PR-GB-002, with the SPI fee-market note for the United Kingdom, data as of 2026-10-14.
  17. SPI Packaging Buyers Database, Tesco and Reckitt profiles, data as of 2026-10-14.

Go deeper

More from SPI Ledger

All articles
  1. News analysis

    Colgate recyclable tube: 98% of toothpaste SKUs switched, and how SB 343, UK RAM and PPWR grades treat it

    The Colgate recyclable tube now carries about 98% of Colgate-Palmolive's toothpaste SKUs worldwide and about 97% in North America, according to its 2025 Sustainability & Social Impact Report, issued on 30 June…

    20 min read

  2. News analysis

    Aldi plastic packaging: 124,940 tonnes, two 50% goals for 2025 with no result, and the UK rules ahead

    Aldi plastic packaging in the UK came to 124,940.15 tonnes in calendar 2023, the only year ALDI UK has published, of which 110,305.88 tonnes was own-label primary plastic. Its two dated goals,…

    19 min read

  3. News analysis

    Haleon sustainability report packaging: 80% recycle-ready, 9% less virgin plastic and the sachets left over

    The Haleon sustainability report packaging figures, in the Health, Inclusivity and Sustainability Report 2025 published in March 2026, cover the year to 30 June 2025: 80% of packaging recycle-ready, up from a…

    20 min read

ClosingAsk the SPI team

Ask the SPI team

What changes for your packaging next quarter?

Tell us your markets and materials. The SPI team walks you through the rules and buyer commitments that affect them.

Prefer email? Write to sales@strategicpackaginginsights.com.

Questions people bring
  1. Q1

    Which packaging rules apply to us in each market we sell in?

    We map each market's EPR, tax, ban, recycled-content, labelling and deposit rules against your materials and formats, and show which are in force, adopted or only proposed.

  2. Q2

    What could EPR fees and plastic taxes cost us next year?

    We apply published fee tables and tax rates to your tonnages and recycled content, and show the result as scenarios with every rate sourced.

  3. Q3

    Can you tell us when a rule changes?

    Yes. The free tracker alerts cover rule changes by country; a monitoring retainer adds monthly notes on what the changes mean for your portfolio.