SPI NewsUnited States · Liquid packaging board
Nippon Dynawave fine: Washington issues record $9.2 million safety penalty over Longview tank failure
Washington’s safety regulator cited Nippon Dynawave Packaging for 75 violations with a USD 9,177,127 penalty, Ecology added USD 296,500, and the company’s 15-day appeal window runs to about 5 December 2026 by SPI’s count.
Key takeaways
- L&I’s release of 20 November says it cited NDP for 75 violations with a USD 9,177,127 penalty, the largest workplace safety and health penalty it has issued; the previous largest, USD 2.9 million, followed the Tesoro refinery explosion in 2010.
- L&I says NDP kept operating a caustic white liquor tank for 43 weeks after a report showed its walls below the minimum safe thickness, and cited one egregious willful serious violation for each of those weeks.
- Ecology’s enforcement page lists a USD 296,500 penalty for 34 violations and a USD 664,776.77 reimbursement order, both dated 20 November; the release adds that NDP may still face a Natural Resource Damage Assessment.
- NDP said on 20 November that L&I’s report omitted important facts and context, that it will use the appeals process, and that the report does not establish root cause; L&I’s release gives 15 days to appeal.
- SPI analysis: the three items add up to USD 10,138,403.77 by SPI’s calculation, against the USD 10,138,127 the release states, because the release rounds Ecology’s share to USD 961,000.
9,177,127
L&I safety and health penalty
USD, 75 violations; the largest in Washington history, L&I says
L&I release 26-21, 20 Nov 2026
296,500
Ecology environmental penalty
USD, 34 violations tied to the 26 May tank failure
Ecology enforcement page
664,776.77
Ecology reimbursement order
USD, state response costs; the L&I release rounds it to USD 665,000
Ecology enforcement page
Source: Washington State Department of Labor & Industries, news release 26-21, 20 Nov 2026; Washington Department of Ecology, Nippon Dynawave compliance and enforcement page (SPI summary), checked 23 Nov 2026.
The Nippon Dynawave fine is, by L&I’s account, the largest workplace safety and health penalty it has ever issued: on 20 November 2026 the state Department of Labor & Industries (L&I) cited Nippon Dynawave Packaging (NDP) for 75 violations and USD 9,177,127 over the 26 May tank failure at its Longview liquid packaging board mill. L&I said it will refer the case for potential criminal prosecution.
The same day, the Washington State Department of Ecology issued a USD 296,500 penalty for 34 environmental violations and a reimbursement order for USD 664,776.77 of state response costs, according to its enforcement page for the mill. NDP said it will contest L&I’s characterisation of its actions through the appeals process, and that it is reviewing Ecology’s penalty before deciding next steps.
For carton makers and the dairy, juice and plant-based drink brands they supply, the penalties are the first quantified state action against a mill that supplies liquid packaging board to carton makers such as Elopak. They land as Nippon Paper, NDP’s parent, plans a phased restart: the parent’s 6 November notice said the outcome of litigation and investigations was not included in its estimated extraordinary losses, as SPI’s restart story reported.
What the Nippon Dynawave fine covers
NDP runs the Longview, Washington, mill that makes coated and uncoated liquid packaging board, the multi-ply paperboard at the core of gable-top and other drink cartons. It is wholly owned by Nippon Paper Industries. SPI’s 10 November story set out what the mill makes, who buys its board and Nippon Paper’s restart plan; this article covers what has happened since.
On 26 May 2026 a tank of caustic white liquor, the alkaline solution a kraft pulp mill uses to cook wood chips, failed at the site. L&I’s release 26-21 says the failure killed 11 workers and seriously injured another 12, and that about 900,000 gallons of caustic white liquor spilled. L&I refers to the vessel as G-tank1.
Ecology’s initial determinations of 26 August say the liquid reached storm drains and the mill’s wastewater treatment system, that some of it bypassed treatment before reaching the Columbia River, and that larger volumes reached a nearby ditch, causing widespread fish die-offs. Ecology said impacts continued for up to eight days4.
Two state agencies have authority over different sides of the event. L&I enforces workplace safety and health law, and its penalties go to the workers’ compensation supplemental pension fund, which helps injured workers and the families of workers who died on the job, the release says. Ecology oversees the mill’s water quality permits, dangerous waste rules and spill plans, and says it does not regulate the structural integrity of the tank itself.
Federal investigators are also at work. NDP’s own updates refer to the U.S. Chemical Safety and Hazard Investigation Board (CSB), and in a statement of 28 August NDP said that investigation can take up to two years. The 20 November actions are state actions only, and SPI has not yet confirmed any federal finding on cause.
What L&I and Ecology announced on 20 November
The record penalty. L&I cited NDP for 75 violations after a six-month investigation, the release says. Over that period the agency interviewed more than 70 witnesses and reviewed more than 40,000 documents1.
The core allegation. L&I says NDP received three separate reports between August 2025 and February 2026 that showed the tank’s walls were corroded significantly beyond their ability to safely hold, and that the company had that knowledge at least as early as August 2025. It says the company continued to operate the tank for 43 weeks after the first report without taking steps to fix the issue.
The standard L&I applied. The release points to API 653, the tank inspection and repair standard published by the American Petroleum Institute. Under API 653, L&I says, when a tank’s wall thickness falls below the minimum safe level, an employer must repair it, reduce its operating capacity or retire it from service.
Why the count is so high. An egregious citation, L&I explains, involves elevated willfulness or harm to workers, and each instance of the violation is counted separately. That is why the G-tank group alone carries 43 cited violations, one for each week the tank stayed in service, according to the release.
The other two groups. L&I also cited NDP over its emergency response and training on 26 May, and over inspection failures at 14 tanks across the site, which the release says include G-tank.
The criminal referral. L&I says it will refer the case to the appropriate authorities for potential criminal prosecution. SPI has not yet confirmed that any authority has opened a criminal case or filed any charge, and this article draws no conclusion on one.
Ecology’s share. Ecology’s enforcement page lists a USD 296,500 penalty for 34 violations tied to the tank failure and its investigation, and a reimbursement order for USD 664,776.77 in state response costs2. The L&I release describes the cost recovery as about USD 665,000 of direct costs to Ecology and the Washington State Military Department for supporting the emergency response in the weeks after the failure.
What may follow on the environmental side. The release says NDP may still face a Natural Resource Damage Assessment based on the environmental impacts of the release. It also says that, under Washington law, Ecology can impose fines of up to USD 10,000 per incident, per day for these violations.
L&I’s director put the agency’s view of the evidence in one sentence.
“Nippon Dynawave had all the information they needed to act, but they didn’t listen to alarms their consultants and staff were raising.”
SPI analysis: by SPI’s calculation, the G-tank counts are 57% of the 75 violations, and the 64 egregious willful serious counts are 85%. The penalty averages about USD 122,362 per violation, though L&I does not set penalties as an average and the release does not price each count.
The 75 violations, group by group
The release sorts the 75 violations into three subjects and three classes. Egregious willful serious is the heaviest class L&I describes; willful serious and serious are the others. The table below sets out the counts as the release gives them; SPI has not yet confirmed the line items against the citation document L&I links from the release.
| Subject | Egregious willful serious | Willful serious | Serious | Total | What L&I alleges |
|---|---|---|---|---|---|
| G-tank operation | 43 | 0 | 0 | 43 | Tank kept in service for 43 weeks after a wall thickness report |
| Emergency response and training | 4 | 3 | 5 | 12 | Shortfalls in emergency response and training on 26 May |
| Inspections at 14 tanks | 17 | 3 | 0 | 20 | Inspection shortfalls at 14 tanks, including G-tank |
| Total | 64 | 6 | 5 | 75 | no data |
Source: Washington State Department of Labor & Industries, news release 26-21, 20 Nov 2026 (SPI summary), checked 23 Nov 2026.
Counts from L&I's release. Totals by SPI's calculation. Classes are L&I's own terms. All counts are citations that NDP can appeal; they are not final findings of fact.
G-tank. The largest group rests on the timeline of reports. L&I’s case is that the company knew, from at least August 2025, that the tank’s walls were below the minimum safe thickness, and did not repair it, reduce its operating capacity or retire it from service, steps L&I says API 653 requires1. NDP disputes the characterisation, as set out below.
Emergency response. Twelve counts cover how the site prepared for and handled the emergency. Ecology’s August notice made a related point on the environmental side, saying some of its violations stem from shortfalls in required plans and training under dangerous waste rules4.
Inspections at 14 tanks. Twenty counts cover L&I’s allegation that internal inspections were not carried out at 14 tanks, G-tank among them. For a pulp and board mill that holds liquor, chemicals and water in many tanks, L&I’s allegation reaches beyond the failed vessel.
Ecology’s 34 violations. Ecology documented 35 violations in its August notice and has now penalised 34. The page does not list which violation dropped out. Ecology said in August that not every violation would necessarily lead to enforcement, since some spill management efforts may be exempt under emergency provisions4.
SPI analysis: Ecology’s penalty averages about USD 8,721 per violation by SPI’s calculation, below the USD 10,000 per incident, per day ceiling the release cites. Ecology said in August that about a quarter of the violations extended over multiple days, so the ceiling alone does not set the figure.
Industry reaction
The voices on record are the two regulators and the company. SPI has not yet confirmed any public statement on the penalties from NDP’s carton customers or from trade bodies.
“No penalty can begin to account for the loss of life in this tragedy.”
Ecology’s director spoke in the joint release, which pairs his agency’s USD 296,500 penalty with L&I’s citation.
“Because Nippon’s safety and health violations were both willful and contributed directly to the deaths of their workers, L&I will also refer the case to the appropriate authorities for potential criminal prosecution.”
The sentence is L&I’s own finding and referral. A referral is not a charge, and SPI has not yet confirmed which authority will receive it; Ecology noted in August that the Washington Attorney General’s Office can investigate possible criminal activity4.
“We will address that issue through the appropriate appeals process.”
The issue NDP refers to is L&I’s characterisation of its actions as egregious and willful serious, which the company’s statement says omitted important facts and context about actions taken by NDP and the timeline of events before and on the day of the incident.
“The report does not establish root cause, which remains under investigation.”
NDP draws a line between L&I’s workplace safety findings and a determination of what caused the failure. It says it is also reviewing Ecology’s penalty and the anticipated cost recovery request, including the basis for each, before deciding next steps, and that it will not comment further while the investigation continues3.
NDP’s update of 18 November, two days earlier, described its work with the CSB, L&I, the U.S. Environmental Protection Agency, the Washington Attorney General’s Office and Ecology. It said the mill has hosted hundreds of site visits by regulators and investigators, and that it has objected before to releases that present preliminary information as an established explanation of the incident.
Who carries the cost, and what the figures do not add up to
The penalties fall on NDP, but the mill sits in a supply chain that runs from a Japanese parent to carton converters and the drink brands that fill their packs. Each party reports in its own currency, so the figures below sit side by side and are not added together.
NDP and Nippon Paper. The USD amounts fall on NDP, and Nippon Paper’s notice of 6 November said the outcome of litigation and investigations by the relevant authorities was difficult to reasonably estimate and was not included in its estimated extraordinary losses. That notice put NDP’s operating loss for the year to 31 March 2027 at about JPY 21.0 billion7. SPI has not yet confirmed any statement from Nippon Paper on the 20 November penalties.
Carton converters. Elopak’s second quarter 2026 report names NDP’s Longview mill as a supplier of its liquid packaging board, and its third quarter report said constrained board supply limited Americas volume growth8,9. Other carton system suppliers that buy North American liquid board carry the same exposure by role; SPI has not yet confirmed their supply terms with NDP from a company source.
Dairy, juice and plant-based drink fillers. These buyers depend on board qualified for their carton systems and lines. The penalties do not change the mill’s output, but an appeal, any further enforcement and the restart plan now run in parallel, and the restart story set out how bought-in board is filling the gap.
Longview employees and the community. L&I’s penalty money goes to the workers’ compensation supplemental pension fund, the release says. No figure in this article measures the human cost of the 11 deaths and 12 serious injuries L&I reports.
| Party | Role | Figure | Source |
|---|---|---|---|
| NDP | Mill owner, cited by L&I | USD 9,177,127 penalty, 75 violations | L&I release 26-21 |
| NDP | Mill owner, penalised by Ecology | USD 296,500 penalty, 34 violations; USD 664,776.77 reimbursement order | Ecology enforcement page |
| Nippon Paper | Parent, 100% owner | NDP operating loss about JPY 21.0bn, year to Mar 2027; litigation and investigation outcomes not in estimated extraordinary losses | Nippon Paper notice, 6 Nov 2026 |
| Elopak, Americas | Carton maker buying NDP board | Adjusted EBITDA EUR 20.1m in Q3 2026, against EUR 21.9m | Elopak Q3 2026 report |
| Longview workforce | Employees during the shutdown | Pay extended through 17 Jan 2027, NDP says | NDP incident updates |
Source: Washington State Department of Labor & Industries, news release 26-21; Washington Department of Ecology, enforcement page; Nippon Paper notice, 6 Nov 2026; Elopak Q3 2026 report, 27 Oct 2026 (SPI summary), checked 23 Nov 2026.
Each figure in its own currency, on its own measure and period. USD for Washington's actions, JPY for Nippon Paper, EUR for Elopak. Do not add up, convert, average or rank across rows. State amounts are open to appeal.
SPI calculation The release states a combined USD 10,138,127. Adding the three items at the precision Ecology publishes, USD 9,177,127 plus USD 296,500 plus USD 664,776.77, gives USD 10,138,403.77, a difference of USD 276.77. The release counts Ecology’s share as USD 961,000, while Ecology’s own two figures sum to USD 961,276.77. L&I’s penalty is about 90.5% of the itemised total.
A year of state enforcement at Longview
The 20 November actions are the largest of five state penalties on NDP in 2026, and two of the L&I citations are unrelated to the tank failure, the agency says. All are in USD, so a same-currency total is possible.
March. Ecology fined NDP USD 5,500 on 17 March for process gas venting above federal limits, its enforcement page shows. That was the latest of eight penalties Ecology lists on the mill since NDP bought it in 2016, together totalling USD 41,5002.
August. L&I cited NDP on 25 August for USD 2,890 over an aqua ammonia clarifier tank, for two violations: not having an inspection programme and not keeping records. L&I said that case was unrelated to the 26 May failure5. The next day Ecology issued its notice of 35 violations tied to the failure.
October. L&I cited NDP for USD 77,800 on 29 October over an April 2026 incident in which, it said, a worker came close to full engulfment in hot pulp. L&I said that inspection was open before 26 May and is unrelated to the tank failure6. SPI has not yet confirmed from an official source whether NDP has appealed it.
November. The L&I and Ecology actions of 20 November followed. The October bulletin noted that state law requires L&I’s findings within 180 days of the opening date. By SPI’s count, 180 days from 26 May ran to 22 November; SPI has not yet confirmed the opening date of the tank failure inspection.
| Date | Agency | Action | Amount, USD | Linked to 26 May failure |
|---|---|---|---|---|
| 17 Mar 2026 | Ecology | Air penalty, process gas venting | 5,500.00 | No |
| 25 Aug 2026 | L&I | Citation, clarifier tank inspections and records | 2,890.00 | No, L&I says |
| 26 Aug 2026 | Ecology | Notice of 35 violations | No penalty | Yes |
| 29 Oct 2026 | L&I | Citation, hot pulp exposure and piping programme | 77,800.00 | No, L&I says |
| 20 Nov 2026 | L&I | Citation, 75 violations | 9,177,127.00 | Yes |
| 20 Nov 2026 | Ecology | Penalty, 34 violations | 296,500.00 | Yes |
| 20 Nov 2026 | Ecology | Reimbursement order, response costs | 664,776.77 | Yes |
| Total penalties | no data | no data | 9,559,817.00 | no data |
| Total with reimbursement | no data | no data | 10,224,593.77 | no data |
Source: Washington Department of Ecology, enforcement page and release of 26 Aug 2026; L&I releases 26-14 and 26-21 and bulletin of 29 Oct 2026 (SPI summary), checked 23 Nov 2026.
USD. Totals by SPI's calculation from the agencies' own figures. Amounts are as issued and open to appeal; SPI has not yet confirmed the appeal status of the earlier citations. The 26 August notice carried no penalty.
SPI analysis: Ecology’s USD 296,500 penalty is about 7.1 times the USD 41,500 total of its eight earlier penalties on the mill from 2017 to March 2026, by SPI’s calculation. L&I’s three 2026 citations add up to USD 9,257,817, of which the tank failure citation is more than 99%.
The pinch point: appeals, root cause and restart run on the same clock
The next weeks bring three processes that move separately. The first is the appeal. L&I’s release gives NDP 15 days to appeal the citation; by SPI’s count from the release date, that runs to about 5 December 2026. L&I’s August release on an earlier citation counted the 15 days from the citation’s issue date, and SPI has not yet confirmed the issue or service date of this one1,5.
Ecology’s route is less clear on the public record. Its enforcement page and the joint release give no appeal period for the USD 296,500 penalty or the reimbursement order, and SPI has not yet confirmed one. NDP says it is still reviewing the basis for each.
The second is cause. NDP’s 18 November update projected that tank deconstruction would conclude in December 2026, that laboratory analysis and testing would likely run through the first quarter of 2027, and that a root cause analysis is unlikely before late spring or early summer 2027. NDP says the CSB investigation can take up to two years3.
The third is restart. Nippon Paper’s plan, reported in SPI’s restart story, put pulp production back in December, with board supplied for now from bought-in base paper and pulp. NDP’s own pages describe a limited return to work and pay for Longview employees through 17 January 2027. SPI has not yet confirmed that pulp or board production has restarted at Longview.
SPI analysis
A buyer reading the record sees regulators that have stated findings, a company that disputes them and says root cause is open, and a restart that depends on site work both sides describe. None of the three has a fixed end date in an official source beyond the 15-day appeal window.
How the penalty compares with Washington's past cases
L&I gives one benchmark. Its previous largest fine, USD 2.9 million, was issued after the Tesoro refinery explosion in 2010, the release says. By SPI’s calculation, the NDP penalty is about 3.2 times that figure, in nominal USD without any adjustment for inflation.
Ecology’s history at the mill gives another. Its enforcement page lists eight compliance orders since 2016 and 56 notices of violation over the same period, including those issued after the failure. The eight earlier penalties ranged from USD 2,000 to USD 9,000 each and covered air and water limits such as sulphur dioxide, opacity and biochemical oxygen demand2.
| Benchmark | Amount, USD | Year | NDP figure against it |
|---|---|---|---|
| Previous largest L&I fine, Tesoro refinery | 2,900,000 | 2010 | L&I penalty about 3.2 times |
| Ecology's eight earlier penalties at the mill, total | 41,500 | 2017 to 2026 | Ecology penalty about 7.1 times |
| Largest single earlier Ecology penalty at the mill | 9,000 | 2017 and 2018 | Ecology penalty about 32.9 times |
| Ecology ceiling per incident, per day | 10,000 | Current law, per the release | Penalty averages about USD 8,721 per violation |
Source: Washington State Department of Labor & Industries, news release 26-21, 20 Nov 2026; Washington Department of Ecology, Nippon Dynawave compliance and enforcement page (SPI summary), checked 23 Nov 2026.
USD, nominal, not adjusted for inflation. Multiples by SPI's calculation. The Tesoro figure is L&I's rounded USD 2.9 million. Ecology's eight earlier penalties ran from 2017 to 2026 and are shown as a total. Different agencies and laws; shown side by side for scale.
For carton buyers, the comparison that matters is less the size of the penalty than what it shows about the mill’s process. The citation covers inspection practice at 14 tanks as well as G-tank, so the condition of other equipment is part of the record that the appeal, Ecology’s review and the restart will each test.
Fee rules form a separate track. Washington’s Recycling Reform Act has required packaging producers to join a producer responsibility organisation or register an individual plan since 1 July 2026, and SPI’s Washington needs assessment story covers how its fees will be set. Cartons already carry their own lines in European fee grids, as SPI’s carton fee analysis shows; none of that changes with the 20 November penalties.
What it means for you
SPI analysis
These points follow from the sources above. They describe what each group faces; they are not legal advice.
- Carton converters: a liquid board mill that supplies North American carton makers now carries a USD 9.18 million citation, a USD 296,500 penalty and a referral, all open to appeal. Supply planning sits alongside a legal process with no end date beyond the 15-day window.
- Dairy, juice and plant-based drink brands: board qualified for their carton systems still comes partly from bought-in sources while Longview restarts. The penalties do not change volumes, but they add a second process, alongside the restart, that decides when the mill’s output returns.
- Procurement teams: supplier risk files for liquid board now include a state record of 75 cited violations and a disputed root cause. NDP says root cause analysis is unlikely before late spring or early summer 2027.
- Investors in the chain: Nippon Paper left litigation and investigation outcomes out of its estimated JPY extraordinary losses; the USD penalties are the first quantified state figures. Elopak reports the supply effect in its Americas segment in EUR.
- Other board makers: Billerud described its European liquid board market as stable and at normal levels in the third quarter, as SPI’s Billerud story reported. The Longview case adds a legal timeline, not a new volume figure, to the supply picture they sell into.
- Sustainability and compliance teams: carton fees under Washington’s producer responsibility law are still being built; the state’s rules sit on the United States tracker page, and buyer profiles in the SPI Buyers Database.
- past
- next
- Tank of caustic white liquor fails at Longview; L&I reports 11 workers killed and 12 seriously injuredpast
- Ecology issues notice of 35 environmental violationspast
- L&I cites NDP USD 77,800 in a case it says is unrelatedpast
- Nippon Paper leaves litigation and investigation outcomes out of its estimated extraordinary lossespast
- L&I cites 75 violations and USD 9,177,127; Ecology issues USD 296,500 penalty and cost order; NDP says it will appealpast
- About the end of the 15-day L&I appeal window, by SPI's countnext
- Tank deconstruction expected to conclude in December, NDP saysnext
- End of NDP's pay extension for Longview employeesnext
- Root cause analysis unlikely before late spring or early summer 2027, NDP saysnext
Source: L&I releases 26-14 and 26-21 and bulletin of 29 Oct 2026; Ecology enforcement page and release of 26 Aug 2026; NDP incident updates; Nippon Paper notice of 6 Nov 2026 (SPI summary), checked 23 Nov 2026.
Show the data
| Date | Label | Category | Link |
|---|---|---|---|
| 2026-05-26 | Tank of caustic white liquor fails at Longview; L&I reports 11 workers killed and 12 seriously injured | past | https://lni.wa.gov/news-events/article/26-21 |
| 2026-08-26 | Ecology issues notice of 35 environmental violations | past | https://ecology.wa.gov/about-us/who-we-are/news/2026/aug-26-ecology-issues-initial-determinations-of-environmental-violations-following-nippon-dynawave |
| 2026-10-29 | L&I cites NDP USD 77,800 in a case it says is unrelated | past | https://content.govdelivery.com/accounts/WADLI/bulletins/430d02f |
| 2026-11-06 | Nippon Paper leaves litigation and investigation outcomes out of its estimated extraordinary losses | past | https://www.nipponpapergroup.com/assets/E-Notice_Regarding_the_Recording_of_Extraordinary_Losses_and_Revision_of_the_Financial_Results_Forecast.pdf |
| 2026-11-20 | L&I cites 75 violations and USD 9,177,127; Ecology issues USD 296,500 penalty and cost order; NDP says it will appeal | past | https://lni.wa.gov/news-events/article/26-21 |
| 2026-12-05 | About the end of the 15-day L&I appeal window, by SPI's count | next | https://lni.wa.gov/news-events/article/26-21 |
| 2026-12-31 | Tank deconstruction expected to conclude in December, NDP says | next | https://www.nippondynawave.com/incident-updates/ |
| 2027-01-17 | End of NDP's pay extension for Longview employees | next | https://www.nippondynawave.com/incident-updates/ |
| 2027-06-30 | Root cause analysis unlikely before late spring or early summer 2027, NDP says | next | https://www.nippondynawave.com/incident-updates/ |
The 5 December point is SPI’s count from the release date. The December and June points stand for the periods NDP gives, not dates it sets.
What to watch next
- About 5 December 2026: end of the 15-day window to appeal L&I’s citation, by SPI’s count from the release date.
- December 2026: NDP’s response to Ecology’s penalty and reimbursement order; SPI has not yet confirmed Ecology’s appeal period.
- December 2026: tank deconstruction expected to conclude, NDP says, and Nippon Paper’s planned pulp restart.
- 17 January 2027: end of NDP’s pay extension for Longview employees.
- First quarter of 2027: laboratory analysis and testing of the tank, likely through this period, NDP says.
- Late spring to early summer 2027: earliest timing NDP gives for a root cause analysis.
- No date confirmed by SPI: any criminal case following L&I’s referral, any Natural Resource Damage Assessment, and the CSB’s findings.
FAQ
How much is the Nippon Dynawave fine?
Washington’s Department of Labor & Industries cited Nippon Dynawave Packaging on 20 November 2026 for 75 violations with a USD 9,177,127 penalty, which L&I calls the largest in state history. Ecology added a USD 296,500 penalty and a USD 664,776.77 reimbursement order. The release states a combined USD 10,138,127; the itemised figures sum to USD 10,138,403.77.
Why was Nippon Dynawave fined?
L&I says the company kept a caustic white liquor tank in service for 43 weeks after a report showed its walls below the minimum safe thickness, before the tank failed on 26 May 2026. It also cited emergency response and inspection shortfalls. Ecology penalised 34 environmental violations linked to the spill reaching drains, a ditch and the Columbia River.
Is Nippon Dynawave appealing the L&I citation?
Yes. NDP said on 20 November 2026 that L&I’s characterisation of its actions omitted important facts and context and that it will address this through the appeals process. L&I’s release gives 15 days to appeal, which by SPI’s count runs to about 5 December 2026. NDP is still reviewing Ecology’s penalty.
Will Nippon Dynawave face criminal charges?
L&I says it will refer the case to the appropriate authorities for potential criminal prosecution, because it considers the violations willful and contributory to the workers’ deaths. A referral is not a charge. As of 23 November 2026, SPI has not yet confirmed that any authority has opened a criminal case or filed charges.
What does the fine mean for liquid packaging board supply?
The penalties do not change the Longview mill’s output, which Nippon Paper planned to restart in phases from December with bought-in base paper and pulp keeping customers supplied. They add an appeal and possible further enforcement alongside the restart. NDP says root cause analysis is unlikely before late spring or early summer 2027.
Sources
- Washington State Department of Labor & Industries, Nippon Dynawave faces $10 million in state penalties, costs related to deadly tank failure (news release 26-21), 20 November 2026, consulted 2026-11-23.
- Washington State Department of Ecology, Nippon Dynawave compliance and enforcement, entries to 20 November 2026, consulted 2026-11-23.
- Nippon Dynawave Packaging, Incident updates, statements of 18 and 20 November 2026, consulted 2026-11-23.
- Washington State Department of Ecology, Ecology issues initial determinations of environmental violations following Nippon Dynawave tank failure, 26 August 2026, consulted 2026-11-23.
- Washington State Department of Labor & Industries, Nippon Dynawave cited for safety violation unrelated to fatal tank incident (news release 26-14), 25 August 2026, consulted 2026-11-23.
- Washington State Department of Labor & Industries, Nippon Dynawave cited in second of two investigations unrelated to May 26 tank failure, 29 October 2026, consulted 2026-11-23.
- Nippon Paper Industries, Notice Regarding the Recording of Extraordinary Losses and Revision of the Financial Results Forecast, 6 November 2026, consulted 2026-11-10.
- Elopak ASA, Third quarter 2026 report, 27 October 2026, consulted 2026-11-10.
- Elopak ASA, Second quarter 2026 report, 17 August 2026, consulted 2026-11-10.
- SPI Regulation Tracker, United States, record data as of 14 October 2026, consulted 2026-11-23.
- SPI News, Nippon Dynawave restart: pulp due in December as Nippon Paper puts the Longview loss at JPY 21 billion, 10 November 2026, consulted 2026-11-23.
- SPI News, Billerud’s price rises covered energy-driven costs in Q3, and it expects positive pricing again in Q4, 23 October 2026, consulted 2026-11-23.
- SPI Ledger, Beverage and liquid food cartons in EPR fee grids: Austria, Belgium, Luxembourg, the Netherlands and Portugal, consulted 2026-11-23.
- SPI News, Washington’s recycling needs assessment closes for comment on 30 October. Its cost data will set reimbursement from 50% in 2030, 20 October 2026, consulted 2026-11-23.