# PPWR declaration of conformity: what the Annex VII file must hold and how long each operator keeps it

> The PPWR declaration of conformity is the signed statement, required under Article 39 of Regulation (EU) 2025/40 since the Regulation began to apply on 12 August 2026, in which the packaging manufacturer declares that a packaging type meets the requirements of Articles 5 to 12; the manufacturer must first run the internal production control procedure in Annex VII, build the technical documentation it lists, and keep both for 5 years after single-use packaging and 10 years after reusable packaging is placed on the market.

Publisher: Strategic Packaging Insights  
Published: 2026-11-13  
Last updated: 2026-11-13  
Page: https://www.strategicpackaginginsights.com/insights/ppwr-declaration-of-conformity-technical-documentation-record-keeping/

**The PPWR declaration of conformity is the signed statement, required under Article 39 of Regulation (EU) 2025/40 since the Regulation began to apply on 12 August 2026, in which the packaging manufacturer declares that a packaging type meets the requirements of Articles 5 to 12; the manufacturer must first run the internal production control procedure in Annex VII, build the technical documentation it lists, and keep both for 5 years after single-use packaging and 10 years after reusable packaging is placed on the market.**

Importers keep a copy for the same periods and must be able to produce the technical file, and manufacturers, authorised representatives and importers each have 10 days to answer an authority's request. The declaration grows in scope as new requirements start between 2028 and 2040, so this SPI Ledger piece maps the paper trail document by document and calculates how many versions a single packaging type can leave on file.

## Executive summary

Directive 94/62/EC never asked for an EU declaration of conformity. Regulation (EU) 2025/40, the Packaging and Packaging Waste Regulation (PPWR), does. Article 71 sets entry into force on the twentieth day after publication and application from 12 August 2026, with one later exception for Article 67(5) on 12 February 2029, according to the unofficial German text on lxgesetze.de. From that date, Article 15(2) requires the manufacturer to carry out the conformity assessment under Article 38, or have it carried out, and to prepare the technical documentation in Annex VII before placing packaging on the market. Where the assessment shows compliance, the manufacturer issues the EU declaration of conformity under Article 39.

SPI's [Directive to PPWR comparison](https://www.strategicpackaginginsights.com/insights/packaging-directive-to-ppwr-what-changed-brand-owners-converters/) covers why this change matters and who the manufacturer is. This piece goes one level down. It reads the declaration and the technical file line by line, sets out what changes for importers, distributors, authorised representatives and suppliers, and shows how the declaration's scope expands as Articles 6, 7, 9, 10 and 12 begin to apply.

Three findings stand out. First, Article 39(1) limits the declaration to Articles 5 to 12, so on 12 August 2026 a typical single-use declaration covered only a few live requirements, chiefly the heavy metal cap in Article 5(4) and, for food-contact packaging, the PFAS limits in Article 5(5). Second, the record-keeping duty is spread across the chain: manufacturers, authorised representatives and importers keep the declaration for 5 or 10 years, and every economic operator keeps supplier and customer records for the same periods under Article 22. Third, the Regulation sets no expiry date for a declaration, but Article 39(2) requires it to be kept up to date and Article 15(4) requires a new assessment when conformity may be affected.

By SPI's calculation, those rules mean one single-use packaging type with no design changes of its own could still have 2 declaration versions on file on 1 January 2036, while a reusable type with one change a year could have 13 (Exhibit 11). The 10-year clock on reusable packaging, not the number of requirements, drives most of that difference.

The Commission's guidance in Notice C/2026/3084 does not bind courts, and the official English text of the articles is not the basis for this piece. SPI relies on the unofficial German text and the Commission's quotations, and marks open points where they arise.

## Key findings

1. Article 39(1) limits the EU declaration of conformity to the requirements in or under Articles 5 to 12, and Article 39(4) makes the manufacturer responsible for compliance by issuing it (unofficial German text, consulted 11 November 2026).
2. Annex VII point 2 lists 6 minimum elements of the technical documentation, from a general description to test reports, and point 4 requires a written declaration for each type of packaging.
3. Annex VIII sets out 8 numbered points for the declaration's model, followed by the signature block; point 3 states that the manufacturer bears sole responsibility for issuing it.
4. Manufacturers (Article 15(3)), authorised representatives (Article 17(2)(a)) and importers (Article 18(7)) hold the declaration for 5 years after single-use and 10 years after reusable packaging is placed on the market, and each must hand documents to an authority within 10 days of a request.
5. **SPI analysis:**  across Articles 5 to 12, SPI counts 12 requirement start points that can enter a declaration between 12 August 2026 and 1 January 2040, of which 3 applied on 12 August 2026 and 6 start on or after 1 January 2030 (Exhibit 5).
6. **SPI calculation:**  a reusable packaging type with one design change a year could hold 13 declaration versions on 1 January 2036, against 7 for a single-use type with the same change rate (Exhibit 11).
7. Two public readings of the 12 August 2026 scope differ: the EuPC guidance lists Articles 5(1), 5(4) and 5(5), while a Northern Ireland FAQ lists Articles 5(4), 5(5) and 11(1) (Exhibit 6).

## What the PPWR declaration of conformity is

The declaration is a product-law document. Recital 108 of the Regulation explains that the conformity assessment procedure should be the internal production control module, drawn from the menu of modules in Decision No 768/2008/EC, the framework behind most EU product rules. Recitals 110 and 111 then tie that procedure to an EU declaration of conformity that the manufacturer draws up (EUR-Lex, recitals of Regulation (EU) 2025/40). The model is familiar from machinery or toys, but the PPWR applies it to every packaging item placed on the EU market.

Article 39 has five paragraphs in the unofficial German text. Paragraph 1 states that the declaration shows that compliance with Articles 5 to 12 has been demonstrated. Paragraph 2 sets the form: the Annex VIII model, the elements of the relevant module in Annex VII, a duty to keep it up to date at all times, and drafting or translation into the language or languages the Member State of placing or making available requires. Paragraph 3 allows a single declaration where several EU acts each require one, naming each act and its Official Journal reference; it may be a file of the individual declarations. Paragraph 4 makes the manufacturer responsible by issuing it. Paragraph 5 asks competent authorities to check the accuracy of some declarations each year on a risk basis.

Two consequences follow for the query "who signs". The Commission's guidance says the conformity assessment can be carried out by the manufacturer or by someone else on its behalf, such as a laboratory or a certification scheme, and that the declaration must be drafted by the manufacturer or its authorised representative using information from suppliers under Article 16(1) (Notice C/2026/3084, section 2). The manufacturer remains the sole operator legally responsible, even where others drafted parts of the declaration. SPI's [PFAS piece](https://www.strategicpackaginginsights.com/insights/pfas-food-contact-packaging-limits-paper-board/) and the Directive comparison set out how Article 3(1)(13) identifies that manufacturer; this piece does not repeat that test.

The CE mark plays no part. Recital 109 says CE marking on packaging should not indicate compliance with the PPWR (EUR-Lex). The declaration and the file behind it are the evidence, not a mark on the pack.

## The technical documentation in Annex VII

Annex VII is headed "conformity assessment procedures" and contains one procedure, Module A, internal production control. Point 1 defines it as the procedure by which the manufacturer meets points 2, 3 and 4 and declares on its sole responsibility that the packaging meets Articles 5 to 12. Point 3 requires the manufacturer to take all measures needed so that manufacturing and its monitoring keep the packaging in line with the documentation. Point 5 lets an authorised representative keep the documentation on the manufacturer's behalf if the mandate says so (gesetze.legal, unofficial German text).

Point 2 sets the content of the file. The documentation must make it possible to assess conformity, must include an adequate analysis and assessment of the risk of non-conformity, and must list the applicable requirements. Exhibit 2 sets out the minimum elements alongside the article-specific additions the Regulation attaches to individual requirements.

Three details matter in practice. First, element (d)(v) shows that standards are not compulsory. Where no harmonised standard or common specification is used, the file describes the solution chosen instead. The Commission's implementation timeline lists a standardisation request on minimisation under Article 10(3) for 12 February 2027 and composting standards under Article 9(6) for 12 February 2026, but no general standardisation request under Article 36 (Green Forum, consulted 11 November 2026).

Second, Article 7(8) in the unofficial text asks the Commission to set the format of the Annex VII documentation for recycled content in the same implementing act that sets the calculation method, which is due by 31 December 2026. The Green Forum lists that act as in preparation. For plastic packaging, the shape of the file for Article 7 is therefore not yet fixed in law.

Third, the file is per packaging type, not per company. Annex VII point 4 requires a written declaration for each type of packaging, which must identify the packaging it covers. The EuPC guidance adds that one declaration can serve packaging with the same characteristics.

Article 16 sets the supply side. Suppliers of packaging or packaging materials must give the manufacturer all information and documentation it needs to demonstrate conformity, including the Annex VII documentation required under Articles 5 to 11, on paper or electronically, in a language the manufacturer can easily understand. Article 16(2) adds the documents that other EU acts require for contact-sensitive packaging, such as food-contact law (lxgesetze.de). The duty runs to the manufacturer, not to the market surveillance authority, so the supplier's evidence enters the public record only through the manufacturer's file.

## Inside the Annex VIII declaration

Annex VIII is a one-page model. Exhibit 3 lists its points as they appear in the unofficial German text, with SPI's note on what each asks of a packaging manufacturer.

SPI analysis

Point 7 is a reminder that the PPWR built the declaration on a general product-law template. Module A, as Annex VII point 1 describes it, is a self-assessment, so the Regulation as read here names no notified body for packaging. A laboratory report can sit in the file as element (f), and the Commission accepts that a laboratory or certification scheme can carry out the assessment on the manufacturer's behalf, but the signature stays with the manufacturer.

Point 8 is where scope can be explained. Article 39(1) speaks of requirements "in or under" Articles 5 to 12, and many of those requirements start later. The EuPC guidance treats requirements not yet in force as outside the current declaration and advises showing them through technical documentation and operational practice. That reading is a trade body's view, not the Commission's, and SPI has not yet confirmed a Commission text on how a declaration should present requirements that have not yet started.

## How the declaration's scope grows from 2026 to 2040

The declaration in force on 12 August 2026 is not the declaration that will be signed in 2030. Exhibit 4 brings together the start points for each requirement in Articles 5 to 12, using SPI's tracker data for PFAS, labelling and recyclability and the unofficial text for the rest.

Two points in Exhibit 4 need care. Article 6(1), the general rule that all packaging must be recyclable, has no deadline of its own, and the Commission reads it as applying from 12 August 2026. The same guidance says manufacturers do not need to carry out the Article 38 assessment for recyclability until the Article 6(4) delegated act is in force, and that until then the old Directive's requirements and harmonised standards apply (Notice C/2026/3084, section 6; SPI tracker [PR-EU-010](https://www.strategicpackaginginsights.com/data/packaging-regulation-tracker/european-union/pr-eu-010/)). SPI's [recyclability grades piece](https://www.strategicpackaginginsights.com/insights/ppwr-recyclability-performance-grades-design-for-recycling/) covers that two-step design in detail.

The labelling dates are also floors, not fixed dates. SPI tracker [PR-EU-003](https://www.strategicpackaginginsights.com/data/packaging-regulation-tracker/european-union/pr-eu-003/) records that the Article 12(6) implementing acts were due on 12 August 2026 and that the Commission still listed them as in preparation in October 2026. The 24-month clock had not started then. SPI's [labelling piece](https://www.strategicpackaginginsights.com/insights/ppwr-labelling-harmonised-material-label-digital-marking/) follows that act.

What did the declaration have to cover on 12 August 2026? Two published readings differ at the edges. The EuPC Packaging Division's guidance of July 2026 lists the general duty to minimise substances of concern in Article 5(1), the heavy metal cap in Article 5(4) and the PFAS limits in Article 5(5) as the obligations applying from that date. A PPWR FAQ published on the website of Northern Ireland's Department of Agriculture, Environment and Rural Affairs (DAERA) in August 2026, where the PPWR applies under the Windsor Framework, lists Articles 5(4), 5(5) and 11(1). Exhibit 6 sets the two side by side with the Commission's own guidance.

SPI analysis

The two lists answer different questions. The EuPC list covers plastic converters, most of whose packaging is single-use, so Article 11 rarely arises; the DAERA list covers all packaging, including reusable transport items. A manufacturer of reusable crates or pallets reading only the converter guidance would miss Article 11(1).

## A framework: four positions around one declaration

The PPWR attaches duties to the declaration at four points in the chain. SPI groups them as signer, contributor, gatekeeper and custodian. The positions are SPI's planning segmentation, not legal categories, and one company can hold several at once.

Article 21 is how the signer position moves. An importer or distributor that places packaging on the market under its own name or trademark, or modifies packaging in a way that may affect compliance, is treated as the manufacturer and takes on Article 15. The Commission's guidance makes the same point when it says importers and distributors may be considered manufacturers (Notice C/2026/3084, section 2). A private-label retailer that orders packaging to its own design is therefore a signer, not a gatekeeper.

The micro-enterprise rule moves it the other way. Where the person under whose name the packaging is made is a micro-enterprise under Recommendation 2003/361/EC, as in force on 11 February 2025, and its supplier is established in the Union, the supplier is treated as the manufacturer for Article 15 (Article 15(12) and Article 21(2) in the unofficial text). SPI tracker [PR-EU-001](https://www.strategicpackaginginsights.com/data/packaging-regulation-tracker/european-union/pr-eu-001/) records the Commission's reading of the same rule under the manufacturer definition: fewer than 10 employees and turnover or balance sheet total of no more than EUR 2 million.

### Importers and distributors: what they check before the pack moves

Article 18(2) lists four things an importer must ensure before placing packaging on the market: that the manufacturer has carried out the Article 38 procedure and prepared the technical documentation; that the pack is labelled under Article 12; that the required documents accompany it; and that the manufacturer has met the identifier and contact rules in Article 15(5) and (6). Article 19(2) gives the distributor a shorter list, which does not include the conformity assessment.

Article 19(4) adds a limit that matters in commercial talks: a distributor may use information the manufacturer discloses only to check compliance with Articles 5 to 12, and may not use it for commercial purposes. A retailer that asks a brand owner for technical files therefore holds them under a use restriction.

## Record keeping: who keeps what, and for how long

The record-keeping rules in the PPWR are short but repeated across five articles. Exhibit 9 brings them together.

Three features of these rules shape how a records system works.

The clock runs per placing. Article 15(3) counts from the day the packaging is placed on the market, and the Commission's guidance ties placing to the moment of filling for filled sales and grouped packaging and to release for free circulation for imports (Notice C/2026/3084, section 5; SPI tracker [PR-EU-001](https://www.strategicpackaginginsights.com/data/packaging-regulation-tracker/european-union/pr-eu-001/)). A packaging type placed on the market continuously for four years keeps its file alive until 5 or 10 years after the last unit, not the first.

The representative cannot take the whole job. Article 17 lets a manufacturer give an authorised representative the retention and response duties, but the mandate cannot include Article 15(1) or the preparation of the technical documentation. SPI's [Omnibus piece](https://www.strategicpackaginginsights.com/insights/omnibus-ppwr-authorised-representative-non-eu-exporters/) covers the separate debate on the EPR representative under Article 45, which is a different role.

Article 22 reaches everyone. Every economic operator, including distributors and fulfilment providers, must be able to name its suppliers and customers of packaging for 5 or 10 years after obtaining or supplying it. For a wholesaler that holds no declaration at all, this is the PPWR record it does keep.

## Scenarios: how many declaration versions one packaging type leaves on file

Article 15(4) requires a new assessment when changes in the design or characteristics of the packaging, or in the standards and specifications the declaration relies on, may affect conformity. Article 39(2) requires the declaration to be kept up to date at all times. The DAERA FAQ adds that a change such as a new paper supplier may require updates to the technical documentation and the declaration. Each version, once replaced, still has to be kept for the Article 15(3) period after the last unit placed under it.

SPI modelled three packaging types against the start points in Exhibit 4. Type A is a single-use plastic food-contact tray, which picks up versions on 12 August 2026, 12 August 2028, 1 January 2030, 1 January 2035, 1 January 2038 and 1 January 2040. Type B is a single-use corrugated transport box, which follows the same dates except 2040, because the recycled content shares apply to plastic. Type C is a reusable plastic crate, which starts on 12 August 2026 and adds the reuse label on 12 February 2029, then 2030, 2035, 2038 and 2040. The low case assumes no design changes of the pack's own; the base case adds one change a year from August 2027; the high case adds one every six months from February 2027.

Three readings follow. First, for single-use packaging the count levels off: by SPI's calculation a single-use type with one change a year carries 7 to 8 versions from the mid-2030s, because older versions age out after 5 years. Second, for reusable packaging the 10-year period roughly doubles the count, from 7 to 13 on 1 January 2036 in the base case. Third, the regulatory dates alone add few versions. In the low case no type exceeds 4 versions on file at any of the dates tested; own design changes, not the Regulation's calendar, decide most of the workload.

The model is deliberately simple. It treats each start point as a new version, while a manufacturer may judge that a new requirement does not change a pack that already meets it. It ignores the delays to Articles 6, 7 and 12 that late secondary acts would cause, which would spread the same versions over later years. And it counts versions of one declaration for one type, not files across a portfolio, which SPI's Directive comparison modelled separately.

## Industry reaction

The Commission's guidance set the line on who the manufacturer is when no brand appears on the pack.

> "The decisive criterion is who places the order and decides on the design specifications for that packaging."

***European Commission** , [Notice C/2026/3084, guidance document on Regulation (EU) 2025/40](https://eur-lex.europa.eu/legal-content/EN/TXT/PDF/?uri=CELEX:52026XC03084), section 2, Official Journal C, 10 June 2026*

That test decides who signs the declaration for unbranded transport or service packaging, where the brand rule in Article 3(1)(13) gives no answer.

Converters' associations moved quickly to guidance of their own. The EuPC Packaging Division published a declaration guide for plastic converters in July 2026, with one line that sums up Article 39(2).

> "The DoC must be updated whenever new information becomes available."

***EuPC Packaging Division** , European Plastics Converters, [PPWR DoC guidance, version 1](https://www.ikem.se/globalassets/media-ikem/dokument/for-vara-medlemmar/branschspecifika-fragor-och-regler/ppwr/ppwr_doc_guidance_eupc_v1_-july-2026.pdf), July 2026*

Public authorities have been equally clear that there is no fixed renewal cycle.

> "There is no set review period for DoCs under PPWR."

***DAERA** , Northern Ireland, [PPWR Frequently Asked Questions](https://www.daera-ni.gov.uk/sites/default/files/2026-08/Frequently%20Asked%20Questions%20-%20Packaging%20and%20Packaging%20Waste%20Regulation.PDF), Q13, August 2026*

Suppliers of industrial packaging have used the same message to set expectations with customers.

> "One of the most common misconceptions is that the packaging supplier prepares the Declaration of Conformity."

***Greif** , industrial packaging manufacturer, [PPWR declarations of conformity explained](https://www.greif.com/ppwr-declarations-of-conformity-explained-who-is-responsible-and-how-to-prepare-for-august-2026/), 16 July 2026*

Before the guidance, the European Organization for Packaging and the Environment (EUROPEN) said in a March 2026 statement that the Commission's guidance notice still did not give businesses enough legal certainty or operational clarity, and called for timely secondary legislation. The scope gaps in Exhibit 6 show that some of that uncertainty remained after 12 August.

## In practice: how the chain is preparing

In practice: Greif.

Greif's article of 16 July 2026, updated on 27 July, says packaging suppliers generally do not prepare the customer's declaration, and that once a filler places filled packaging on the market under its own name or brand, that party owns the conformity assessment, the technical documentation and the declaration. Greif offers PPWR technical statements and datasheets covering specifications, material composition, heavy metals, PFAS where applicable, reusability and the standards applied, for customers to fold into their own files. That is the Article 16 contributor role in Exhibit 7.

In practice: EuPC Packaging Division.

The EuPC guidance of July 2026 tells plastic converters to inventory every format and component, identify suppliers and customers for each, build internal templates on Annexes VII and VIII, name a signatory and keep records in a version-controlled system. It states that makers of plastic film are suppliers, not manufacturers, and do not issue the declaration, and that importers of packaging from outside the EU must hold a copy of the manufacturer's declaration under Article 18(7).

In practice: Pro-K.

The German plastics association Pro-K, through its storage and transport systems division, published a sample EU declaration of conformity for manufacturers, producers and distributors of reusable plastic and transport packaging, covering recyclability, recycled material, reusability, material restrictions and technical documentation (Industrial Production report, consulted 11 November 2026). The association also asked German and EU institutions for proportionate requirements on conformity assessment, documentation and labelling for pallets, crates and containers, the packaging type where Exhibit 11 shows the longest records tail.

In practice: DAERA, Northern Ireland.

The DAERA FAQ says Northern Ireland will take a pragmatic initial approach to declarations for Articles 5(4), 5(5) and 11(1), that the Food Standards Agency enforces food-contact PFAS rules under food law, and that a PPWR declaration does not replace the separate declaration of compliance that food-contact law requires. It lists test reports as part of the technical documentation and repeats the 5-year and 10-year retention periods.

## What leaders should do now

These are business planning points drawn from what the Regulation and the guidance say. They are not legal advice, and each company's position depends on its own facts and its own advisers.

1. **Regulatory affairs teams at brand owners, before the next pack launch:**  Exhibit 7 shows that a brand owner ordering packaging to its own design is the signer, so the launch timeline for a new pack includes an Annex VII file and a signed declaration before the first unit is filled.
2. **Converters and material suppliers, through 2027:**  Article 16 makes supplier evidence the raw material of the customer's file, and Exhibit 2 lists what that file needs, which makes a standard statement per grade, like the ones Greif and the EuPC describe, the usual response to customer requests.
3. **Importers of packaging and packaged goods, before each shipment's release for free circulation:**  Article 18(2) puts the conformity assessment and the technical file on the importer's checklist, and Article 18(7) requires a copy of the declaration on file for 5 or 10 years.
4. **Records and IT owners, by mid-2027:**  Exhibit 9 sets two different clocks, one from placing on the market and one from obtaining or supplying, and Exhibit 11 shows versions piling up for reusable packaging, so retention rules keyed to the last placing date of each version fit the Regulation better than a fixed company-wide period.
5. **Reusable packaging pool operators, before the 2029 reuse label:**  Exhibit 6 shows that converter guidance may leave out Article 11(1), and Exhibit 11 shows the longest records tail for reusable types, so their declarations carry the most history.
6. **Quality managers, ongoing:**  Article 15(4) and the DAERA FAQ tie a new assessment to changes such as a new supplier, which links supplier change control directly to the declaration.

## Questions for your board

- For each packaging type we place on the EU market, which legal entity signs the declaration, and does it hold the Annex VII file?
- Which of our declarations name Article 5(4), Article 5(5) and, for reusable packaging, Article 11(1), and who decided their scope?
- Can we produce any technical file within 10 days of an authority's request, in a language that authority understands?
- How many declaration versions do we expect to hold in 2036, and does our records system key retention to the last placing date?
- Where we import, do we check the manufacturer's assessment and keep a copy of the declaration for 5 or 10 years?
- Which supplier changes trigger a new assessment under Article 15(4), and who is told?

## What to watch

- **31 Dec 2026:**  due date for the Article 7(8) implementing act on recycled content, which also sets the format of the Annex VII documentation for it.
- **12 Feb 2027:**  due date for the minimisation standardisation request under Article 10(3) and for the Article 11(2) delegated act on minimum rotations for common reusable formats.
- **1 Jan 2028:**  due date for the Article 6(4) delegated acts, which start the 24-month clock for design for recycling in the declaration.
- **12 Feb 2028:**  compostability under Article 9(1) for the items it lists.
- **12 Aug 2028 at the earliest:**  harmonised material label under Article 12(1), or 24 months after the Article 12(6) implementing acts take effect, whichever is later.
- **No date confirmed by SPI:**  any Commission text on how a declaration should present requirements that have not yet started.

## Methodology

- **Data used:**  Regulation (EU) 2025/40, Articles 5, 7, 15 to 19, 22, 38, 39 and 71 and Annexes VII and VIII; Commission Notice C/2026/3084, sections 2, 5, 6 and 12; the Commission's PPWR implementation timeline; the EuPC Packaging Division guidance of July 2026; the DAERA FAQ of August 2026; Greif's article of July 2026; a report on the Pro-K template; a Gleiss Lutz summary of the Commission's August 2026 FAQ; SPI rule notes [PR-EU-001](https://www.strategicpackaginginsights.com/data/packaging-regulation-tracker/european-union/pr-eu-001/), [PR-EU-002](https://www.strategicpackaginginsights.com/data/packaging-regulation-tracker/european-union/pr-eu-002/), [PR-EU-003](https://www.strategicpackaginginsights.com/data/packaging-regulation-tracker/european-union/pr-eu-003/) and [PR-EU-010](https://www.strategicpackaginginsights.com/data/packaging-regulation-tracker/european-union/pr-eu-010/) (data as of 14 October 2026). Consulted 11 November 2026 unless stated.
- **Legal text:**  this piece relies on the unofficial German text of the Regulation on lxgesetze.de (articles) and gesetze.legal (annexes), with SPI's translations, and on the Commission's quotations of Articles 3, 5, 6, 15, 38 and 39 in Notice C/2026/3084. The EUR-Lex English text consulted gives the recitals; SPI has not yet confirmed the English wording of the articles and annexes against the Official Journal. Article numbers match those the Commission's guidance cites.
- **Counting rules:**  Exhibit 5 counts the rows of Exhibit 4 by year of earliest start. Exhibit 11 counts versions in use plus replaced versions still inside the retention period after their last placing, on the dates shown. Own-change rates of 0, 1 and 2 a year are SPI assumptions.
- **Commission FAQ:**  the Commission's FAQ of 3 August 2026 is cited through its publication page and the Gleiss Lutz summary, which reports that one assessment can cover a multi-component pack and that the declaration is drawn up in the language of the Member State of placing. SPI has not yet confirmed those points against the FAQ text itself.
- **Cut-off:**  11 November 2026.
- **Limitations:**  SPI has not yet confirmed a Commission text on declaring requirements that have not yet started, the adoption of the Article 7(8), Article 6(4) and Article 12(6) acts, or any national penalty for a missing declaration. SPI makes no testing, certification or laboratory claims. This is analysis of what the rules say, not legal advice.

## Sources

1. [lxgesetze.de, Regulation (EU) 2025/40 Article 15, unofficial German text](https://lxgesetze.de/ppwr/15), consulted 2026-11-11.
2. [lxgesetze.de, Regulation (EU) 2025/40 Article 16, unofficial German text](https://lxgesetze.de/ppwr/16), consulted 2026-11-11.
3. [lxgesetze.de, Regulation (EU) 2025/40 Article 17, unofficial German text](https://lxgesetze.de/ppwr/17), consulted 2026-11-11.
4. [lxgesetze.de, Regulation (EU) 2025/40 Article 18, unofficial German text](https://lxgesetze.de/ppwr/18), consulted 2026-11-11.
5. [lxgesetze.de, Regulation (EU) 2025/40 Article 19, unofficial German text](https://lxgesetze.de/ppwr/19), consulted 2026-11-11.
6. [lxgesetze.de, Regulation (EU) 2025/40 Article 22, unofficial German text](https://lxgesetze.de/ppwr/22), consulted 2026-11-11.
7. [lxgesetze.de, Regulation (EU) 2025/40 Article 38, unofficial German text](https://lxgesetze.de/ppwr/38), consulted 2026-11-11.
8. [lxgesetze.de, Regulation (EU) 2025/40 Article 39, unofficial German text](https://lxgesetze.de/ppwr/39), consulted 2026-11-11.
9. [lxgesetze.de, Regulation (EU) 2025/40 Article 71, unofficial German text](https://lxgesetze.de/ppwr/71), consulted 2026-11-11.
10. [gesetze.legal, Regulation (EU) 2025/40 Annex VII, unofficial German text](https://gesetze.legal/eu/vo_eu_2025_40/anhang_vii), consulted 2026-11-11.
11. [gesetze.legal, Regulation (EU) 2025/40 Annex VIII, unofficial German text](https://gesetze.legal/eu/vo_eu_2025_40/anhang_viii), consulted 2026-11-11.
12. lxgesetze.de, Regulation (EU) 2025/40, unofficial German text of the requirement articles: [Article 5](https://lxgesetze.de/ppwr/5), [Article 7](https://lxgesetze.de/ppwr/7), [Article 9](https://lxgesetze.de/ppwr/9), [Article 10](https://lxgesetze.de/ppwr/10), [Article 11](https://lxgesetze.de/ppwr/11) and [Article 21](https://lxgesetze.de/ppwr/21), consulted 2026-11-11.
13. [EUR-Lex, Regulation (EU) 2025/40, OJ L 22.1.2025, recitals](https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=OJ:L_202500040), consulted 2026-11-11.
14. [European Commission, Notice C/2026/3084, guidance document on Regulation (EU) 2025/40](https://eur-lex.europa.eu/legal-content/EN/TXT/PDF/?uri=CELEX:52026XC03084), OJ C 10 June 2026, consulted 2026-11-11.
15. [European Commission (DG ENV), FAQ on the Packaging and Packaging Waste Regulation](https://environment.ec.europa.eu/publications/faq-packaging-and-packaging-waste-regulation-ppwr_en), 3 August 2026, consulted 2026-11-11.
16. [European Commission Green Forum, PPWR implementation timeline](https://green-forum.ec.europa.eu/packaging-and-packaging-waste-regulation-implementation_en), consulted 2026-11-11.
17. [EuPC Packaging Division, PPWR Declaration of Conformity guidance, version 1](https://www.ikem.se/globalassets/media-ikem/dokument/for-vara-medlemmar/branschspecifika-fragor-och-regler/ppwr/ppwr_doc_guidance_eupc_v1_-july-2026.pdf), July 2026, consulted 2026-11-11.
18. [DAERA, Packaging and Packaging Waste Regulation Frequently Asked Questions](https://www.daera-ni.gov.uk/sites/default/files/2026-08/Frequently%20Asked%20Questions%20-%20Packaging%20and%20Packaging%20Waste%20Regulation.PDF), August 2026, consulted 2026-11-11.
19. [Greif, PPWR declarations of conformity explained](https://www.greif.com/ppwr-declarations-of-conformity-explained-who-is-responsible-and-how-to-prepare-for-august-2026/), 16 July 2026, consulted 2026-11-11.
20. [Industrial Production, Pro-K publishes sample template for EU declaration of conformity](https://www.industrial-production.de/economy---business/assistance-with-ppwr-implementation--pro-k-publishes-sample-template-for-eu-declaration-of-conformity.htm), consulted 2026-11-11.
21. [EUROPEN, PPWR Guidance reactive statement](https://www.europen-packaging.eu/wp-content/uploads/2026/03/EUROPEN-PPWR-Guidance-Reactive-Statement.pdf), March 2026, consulted 2026-11-11.
22. [Gleiss Lutz, Commission FAQs on the Packaging and Packaging Waste Regulation](https://www.gleisslutz.com/en/know-how/commission-faqs-packaging-and-packaging-waste-regulation), 10 September 2026, consulted 2026-11-11.
23. [SPI Regulation Tracker, PR-EU-001, PPWR](https://www.strategicpackaginginsights.com/data/packaging-regulation-tracker/european-union/pr-eu-001/), with PR-EU-002, PR-EU-003 and PR-EU-010, data as of 2026-10-14.